Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Alaska guideAlaska Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Alaska
  4. ›Construction
  5. ›E2290300 Quartz Creek to Sterling T-Line Rebuild Phase 2

Chugach Electric Association·Alaska

E2290300 Quartz Creek to Sterling T-Line Rebuild Phase 2

Closes 7/2/2026$25M – $35MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The contract involves rebuilding an existing 115 kV wood‑pole transmission line segment near Sterling, Alaska to modern 230 kV standards. Work includes installing new steel H‑frame and pole‑angle structures, upgrading conductors to 795 kcmil ACSR “Drake”, adding OPGW fiber‑optic cable and OHGW, and delivering as‑built documentation, warranties, and required insurance. The project spans roughly 18.5 mi of corridor with challenging terrain (peat bogs) and requires detailed scheduling, safety, and coordination with existing utility infrastructure. • Replace wood H‑frames and pole‑angles with steel structures (direct‑embed and pipe‑pile foundations). • Install 795 kcmil ACSR conductors and OPGW fiber‑optic cable, plus OHGW on opposite side of each structure. • Provide full construction documentation, warranties, and unit‑based payment upon completion; work must start within 30 days of NTP and finish by June 30 2027.

Attached files

Contact

Chris Kohler(Project Manager)

[email protected]

Key dates

Opened
5/5/2026
Questions due
6/11/2026
Pre-bid meeting
6/4/2026
Site visit
6/4/2026
Closes
7/2/2026
Duration
12 months

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237130
Solicitation №
E2290300

Budget estimate

$25,000,000 – $35,000,000

The ITB does not disclose a total contract value; payment is unit‑based on completed work. Based on industry benchmarks for Alaska high‑voltage transmission upgrades (approximately $1.5–$2.5 million per mile for steel‑structure line construction, plus additional cost for OPGW and engineering services), the 18.5‑mile segment could generate roughly $25 million to $35 million in revenue for the winning contractor. Factors influencing the range include material logistics in remote Alaska, seasonal construction windows, and the extent of subcontractor involvement.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Tarrant Regional Water District·Texas

Top match · 67%

Cedar Creek Section 2 Phase 2 Pipeline Replacement

Closes 12/10/2026Opened 10/29/2026

Gloucester County·Virginia

66% match

IFB 27-012-CJ Clements Avenue Water Line Replacement

Closes 11/5/2026Opened 10/9/2026

U.S. Department Of Defense·Missouri

65% match

Belle Fountain Ditch Cleanout Phase 2

Closes 11/3/2026Opened 10/13/2026

Massachusetts Town of Westborough·Massachusetts

65% match

27-2100 IFB Route 9 Water Main Rehabilitation-Phase I

Closes 11/19/2026Opened 10/28/2026

City of Rockford·Illinois

65% match

LEAD SERVICE LINE REPLACEMENT PHASE 11I

Closes 11/2/2026Opened 9/14/2026

Catawba Regional Council of Governments·South Carolina

64% match

Shannon Street Waterline Project

Closes 11/5/2026Opened 9/30/2026

City of Grand Forks·North Dakota

64% match

2027 Lead Service Line Replacement

Closes 11/19/2026Opened 10/29/2026

U.S. Department Of Transportation·Wyoming

64% match

WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3

Closes 9/23/2028Opened 10/20/2026

City of Rockford·Illinois

64% match

LEAD SERVICE LINE REPLACEMENT PHASE 11H

Closes 11/2/2026Opened 9/14/2026

City of Rockford·Illinois

64% match

LEAD SERVICE LINE REPLACEMENT PHASE 11G

Closes 11/2/2026Opened 9/14/2026

Public Water Supply District No. 2 of St. Charles County·Missouri

64% match

Western Transmission Main Phase 4C

Closes 11/19/2026Opened 10/9/2026

U.S. Department Of Transportation·Washington

64% match

WA ERFO NPS OLYM 2022-1(3), OLYMPIC NPS ERFO REPAIRS 2022 Road 107 MP 0.3 TO 0.5 & MP 0.8

Closes 9/24/2027Opened 9/24/2026

City of Lake City and City of Bellechester·Minnesota

64% match

Lake City & Bellechester Lead Service Line Replacement Project

Closes 12/8/2026Opened 10/16/2026

Upper Occoquan Service Authority·Virginia

64% match

UOSA IFB 27-02 P2NR+ Construction

Closes 11/4/2026Opened 8/24/2026

City of Bellevue·Washington

64% match

2027 Phase 1 Water Main Replacement

Closes 11/12/2026Opened 10/22/2026

Santa Clara Valley Water District·California

64% match

C0720 Coyote Percolation Dam Phase 2

Closes 11/18/2026Opened 10/15/2026

City of Waco·Texas

63% match

Flat Creek Reuse Project Phase 1A

Closes 12/1/2026Opened 10/2/2026

Bristol Virginia Utilities Authority·Virginia

63% match

CAST IRON WATER LINE REPLACEMENT PROJECT - PHASE 1

Closes 11/5/2026Opened 10/1/2026

Riverton City·Utah

63% match

CC26-475 Main Water Tank Drainline Upgrade Project

Closes 11/17/2026Opened 10/30/2026

City of Lebanon·Indiana

63% match

Sanitary Ditch CSX Crossing - RE-BID

Closes 11/9/2026Opened 10/16/2026

Tuolumne County·California

63% match

Mechanical Site Prep: Jawbone Creek Item 2

Closes 11/13/2026Opened 10/16/2026

Town of Upton·Wyoming

63% match

Phase 2.2 - Wyoming & Montana Avenues, Improvements

Closes 11/6/2026Opened 10/23/2026

Maryland Department Of General Services·Maryland

63% match

F-001-260-004 Sand and Spring Run Subsidence Repair

Closes 11/5/2026Opened 9/23/2026