The project entails a full replacement of the natural‑gas generator serving the Technical & Industrial building at Washtenaw Community College, requiring demolition of the existing unit, installation of a larger generator set, related mechanical and electrical systems, and comprehensive commissioning.
• Demolition of the current generator, fuel‑gas equipment, and associated mechanical/electrical components.
• Supply and install a new, higher‑capacity natural‑gas generator with automatic transfer switch, panelboards, fuel‑gas and HVAC piping, and integration into the building‑automation system.
• Conduct full electrical testing, arc‑flash hazard analysis, and provide a five‑year warranty on the generator and transfer switch plus a one‑year maintenance service.
• Perform work primarily on a third‑shift schedule (≈10 p.m.–6:30 a.m.) to minimize campus disruption and coordinate closely with campus utilities, fire‑alarm, elevator, and lighting systems.
• Include a $40,000 allowance for scope changes and multiple optional alternates (e.g., third‑shift interior/exterior work, tie‑ins to fire‑alarm, site lighting, freeze‑protection, and site‑work).
• Deliver complete operation & maintenance manuals, as‑built drawings, warranty documentation, and conduct at least four hours of on‑site training for college personnel.