Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Pennsylvania guidePennsylvania Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Pennsylvania
  4. ›Construction
  5. ›Mill Dairy Trail Bridge Abutment Underpinning

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

Mill Dairy Trail Bridge Abutment Underpinning

Closes 10/1/2026$50k – $100kInvitation for BidLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

This solicitation seeks a qualified contractor to perform emergency scour repair and underpinning of the Mill Dairy Trail Bridge abutment located in Tyler State Park, Bucks County, PA. The work involves removing undermined stone masonry, installing a reinforced‑concrete apron, replacing missing stones, installing temporary stream diversion, dewatering, erosion‑control measures, and completing site restoration. The contract requires a 10 % bid bond, performance and material bonds, extensive insurance coverage, compliance with prevailing‑wage and environmental statutes, and adherence to a 120‑day construction schedule after receipt of the Notice to Proceed. The contractor must be able to submit detailed submittals, maintain documentation for payroll and wage certifications, and provide as‑built drawings for final payment. • Underpinning of existing stone abutment with reinforced concrete apron, stone replacement, and temporary stream diversion. • Required erosion and sediment control plan, dewatering, rock‑lining, and post‑construction landscaping. • Mandatory bonds (10 % bid, 100 % performance and material) and insurance (workers’ comp, public liability, automobile liability). • Completion within 120 calendar days after NTP; strict compliance with CPC, DGS, and environmental permits (DEP GP‑11, PASPGP‑7).

Attached files

Contact

Abraham Kuol(Program Manager)

[email protected]

Key dates

Opened
9/2/2026
Questions due
9/28/2026
Closes
10/1/2026
Duration
120 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
FDC-425-7436.1

Budget estimate

$50,000 – $100,000

The Engineer’s Estimate listed in the solicitation is $50,000‑$100,000. Considering required bonds, insurance, and potential change‑order contingencies, the contractor’s net earnings are likely to fall within this range, perhaps skewing toward the mid‑range after overhead and profit.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Maryland Department Of General Services·Maryland

Top match · 69%

P-020-170-002A Bridge Crossing and Trail Improvements at Patapsco Valley State Park – Mckeldin Area

Closes 1/11/2027Opened 10/31/2026

Minnesota Department of Administration·Minnesota

69% match

Minnesota Valley State Trail; Nine Mile Creek to Interstate 35W

Closes 11/17/2026Opened 10/15/2026

County of Marin·California

68% match

MCP 2026-07 CASCADE CANYON TRAIL BRIDGE PROJECT

Closes 12/3/2026Opened 10/27/2026

Connecticut Town of Simsbury·Connecticut

67% match

Curtiss Park Trail State Project No. 128-158

Closes 11/17/2026Opened 10/15/2026

City of Keene·New Hampshire

67% match

Ashuelot Rail Trail Bridge (KSC) Rehab

Closes 11/24/2026Opened 10/21/2026

City of Fort Myers·Florida

67% match

John Yarbrough Linear Park (JYLP) Trail Construction from Colonial Blvd. to Hanson St. Rebid (Sun Trail 447515-1-54-01)

Closes 11/16/2026Opened 10/7/2026

Cobb County·Georgia

66% match

Chattahoochee River Trail – FM SR 139 to Nickajack Creek – Phase II Public Notice of Advertisement

Closes 4/8/2027Opened 9/21/2026

Connecticut Town of Cheshire·Connecticut

65% match

2627-05 Mixville Park Pedestrian Bridge

Closes 11/3/2026Opened 10/13/2026

U.S. Department Of Agriculture·California

65% match

HUMBOLT PACIFIC CREST TRAIL BRIDGE REPLACEMENT

Closes 11/28/2026Opened 10/29/2026

Massachusetts Department of Transportation·Massachusetts

65% match

616276 FOXBOROUGH-MIDDLEBOROUGH-NORTON FAP No. STP(BR-OFF)-004S(017)X Bridge Preservation along I-

Closes 11/3/2026Opened 9/21/2026

Kenosha County·Wisconsin

65% match

Pike Mountain Bike Trail Restoration and Improvements

Closes 11/5/2026Opened 10/9/2026

City of Green Bay·Wisconsin

65% match

Pike Hike Mountain Bike Trail restoration and Improvements

Closes 11/5/2026Opened 10/9/2026

City of Keene·New Hampshire

64% match

Ashuelot Rail Trail Bridge (KSC) Rehab

Closes 11/24/2026Opened 10/21/2026

U.S. Department Of Transportation·Washington

64% match

ID FLAP KOOTEN 8450(1), Yellowstone Trail Road, Segment 1

Closes 8/20/2028Opened 8/20/2026

Iowa City·Iowa

64% match

Highway 6 Trail - Broadway Street to Fairmeadows Boulevard Iowa DOT Project Number: TAP-U-3715(674)--8I-52

Closes 11/17/2026Opened 10/21/2026

City of Cincinnati·Ohio

64% match

Little Miami Scenic Trail Shared Use Path PID 115291

Closes 11/18/2026Opened 10/28/2026

County of Fairfax·Virginia

63% match

Advertisement for Bid for the Little River Turnpike Walkway – Eastbound

Closes 11/30/2026Opened 10/30/2026

Cherry Hill Township·New Jersey

63% match

2026 Downs Farm Bridge Re-Bid #1

Closes 11/10/2026Opened 10/27/2026

City of Elko·Nevada

63% match

HARP Trail Extension-Re

Closes 11/2/2026Opened 8/25/2026

Town of Camp Verde·Arizona

63% match

Park Verde Road Irrigation Crossing Improvements Project

Closes 11/3/2026Opened 10/8/2026

City of Keene·New Hampshire

63% match

THT Phase#2, NHDOT#45251 Design Project

Closes 11/19/2026Opened 10/9/2026

U.S. Department Of The Interior·Wyoming

63% match

Z--YELL 338223 - Bridge Preservation

Closes 11/6/2026Opened 10/7/2026

Minnesota Department of Transportation·Minnesota

63% match

260132 SP 5212-42

Closes 11/18/2026Opened 10/21/2026

Maryland Department of Natural Resources·Maryland

63% match

Trail Ph 2 - Construction at Gathland State Park

Closes 11/3/2026Opened 10/9/2026

Georgia Cobb County Department of Transportation·Georgia

63% match

B2432 - Chattahoochee River Trail, Phase II

Closes 1/15/2027Opened 9/28/2026