The Bureau of Reclamation, Upper Colorado Region, is seeking a design-build contractor to upgrade the yard piping and flow measurement infrastructure at the Brackish Groundwater National Desalination Research Facility (BGNDRF) in Alamogordo, New Mexico. The project includes designing and constructing new piping to support three supply and waste manifolds, providing a new piping system for a future supply tank, and installing magnetic flow meters. The contractor will be responsible for designing, constructing, and testing the upgrades. The project will be conducted in two phases, with a traditional design-build delivery method.
• The project requires a design phase to collect design data, prepare designs, and develop a final price proposal.
• The construction phase includes completing construction tasks, installing new conduit, and providing temperature-controlled heat trace and insulation for all pressure piping.
• The contractor must also install magnetic flow meters, provide controls and integration with the existing SCADA system, and conduct testing, training, and commissioning.
• The project has a total available budget of $500,000 to $1,000,000 and a scheduled completion date of 122 days after contract award for review of 90% design and 305 days for construction, commissioning, and performance testing.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.