The City of Cairo is seeking bids for the construction of Water Pollution Control Plant Improvements. The work to be done includes furnishing all labor, materials, and equipment necessary to construct the proposed Water Pollution Control Plant Improvements as shown on the construction drawings. The project consists of demolition, site work, concrete channels and structure for grit removal system, concrete slabs and driveway, bar screen, screening conveyor, stop gates, grit removal system, screw conveyor and grit concentrator, hydraulic dredging of 4 tanks, aluminum walkway, rehabilitation of south clarifier, and rehabilitation of orbal oxidation ditch. The work further includes piping, drains, valves, appurtenances, and electrical necessary for a complete and functional facility.
The key features of this project include:
• Construction of Water Pollution Control Plant Improvements
• Demolition, site work, and concrete channels and structure for grit removal system
• Installation of bar screen, screening conveyor, stop gates, grit removal system, screw conveyor and grit concentrator
• Hydraulic dredging of 4 tanks
• Aluminum walkway, rehabilitation of south clarifier, and rehabilitation of orbal oxidation ditch
• Piping, drains, valves, appurtenances, and electrical necessary for a complete and functional facility