The project involves upgrading the HVAC system distribution pumps and associated components at the East Orange VAMC. The existing pumps are in poor condition and need to be replaced to reduce maintenance time, improve system control, and enhance the distribution of heating and cooling. The contractor shall prepare the site, demolish and remove existing pumps, and furnish labor, materials, and supervision to perform the work according to AE drawings and specifications. The project objective is to replace the existing main Condenser Water Pumps and pumps serving the Operating Room Chiller system.
Key aspects of the project include:
• Replacement of existing pumps with new ones
• Demolition and removal of existing pumps and associated components
• Furnishing labor, materials, and supervision for the project
• Preparation of the site for building operations
• Improvement of system control and heating and cooling distribution
• Enhancement of the environment for patients, visitors, and staff
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.