Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Colorado guideColorado Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Colorado
  4. ›Construction
  5. ›Snake River WWTP Laboratory Renovation

Summit County·Colorado

Snake River WWTP Laboratory Renovation

Closes 4/2/2026$600k – $1.2MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Summit County Government is seeking qualified contractors to provide both design and construction services for a full renovation of the Water Quality Laboratory at the Snake River Wastewater Treatment Plant in Dillon, CO. The work includes demolition of existing laboratory finishes, replacement of windows, countertops, casework, fume hoods, sinks, lighting, ceiling and flooring, minor carpentry, interior painting, permitting, and any required hazardous‑material abatement. The contractor must work regular business hours (Mon‑Fri, 7 am‑5 pm) during the 2026 construction season and must supply insurance meeting County specifications. • Design‑build scope: complete lab redesign and construction, including all mechanical, electrical, and plumbing upgrades. • Mandatory submission requirements: proposal titled “Proposal for 2026 Water Quality Laboratory Renovation,” emailed to two County contacts (and optionally mailed) by 2 pm MST, April 2, 2026. • Evaluation based on lowest responsible bid, with award expected around April 23, 2026; contractor must provide certificates of insurance within 7 days of contract execution.

Attached files

Contact

Josh Johnson(Utility Director)

[email protected]

(970) 668-4272

Key dates

Opened
3/6/2026
Questions due
3/13/2026
Pre-bid meeting
3/24/2026
Closes
4/2/2026
Projected award
4/23/2026
Duration
3 months

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
236220
Solicitation №
SRWWTP 2026‑02

Budget estimate

$600,000 – $1,200,000

No explicit contract value is disclosed. Based on the scope (complete demolition, replacement of fixtures, interior finishes, permitting, and abatement) for a municipal laboratory of roughly 3,000‑4,000 sq ft, typical renovation costs in Colorado range from $150‑$250 per square foot. That yields an estimated contract value between $450,000 and $1,000,000. Adding design engineering fees (10‑15 % of construction) and contingency, the likely award could fall between $600,000 and $1.2 million.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. General Services Administration·Maryland

Top match · 65%

FDA Lab Renovation in Silver Spring, MD

Closes 11/5/2026Opened 10/14/2026

University of Louisville·Kentucky

65% match

Fresh Tissue Lab Renovation | CM/GC

Closes 11/3/2026Opened 10/9/2026

The University of North Carolina·North Carolina

65% match

Firestone Lab Renovation - College of Veterinary Medicine (CVM) Main Building

Closes 11/4/2026Opened 10/6/2026

U.S. Department Of Commerce·Maryland

63% match

Building 215 Clean Room HEPA Filter Replacement

Closes 11/2/2026Opened 9/29/2026

Shawnee State University·Ohio

63% match

Shawnee State University Technology Innovation Lab Project Rebid ADDENDUM #1

Closes 11/4/2026Opened 10/28/2026

City of Charlotte·North Carolina

62% match

Service Water Improvements and Flow Meter Modifications

Rolling / TBD closeOpened 1/31/2026

Laramie Rivers Conservation District·Wyoming

62% match

Laramie River - Hart Ranch Restoration

Closes 11/8/2026Opened 8/27/2026

Eastern Municipal Water District·California

62% match

Purified Water Replenishment SJV Advanced Water Purification Facility

Closes 11/19/2026Opened 8/25/2026

City of Long Prairie·Minnesota

62% match

Long Prairie, City of Water Treatment Plant Rehabilitation 25X.138024

Closes 11/18/2026Opened 10/29/2026

James City County·Virginia

61% match

Chickahominy Riverfront Park Pool

Closes 11/9/2026Opened 10/9/2026

Clear Creek ISD·Texas

61% match

Brookside, League City, Space Center Intermediate School Renovations

Closes 11/3/2026Opened 10/6/2026

U.S. Department Of Energy·Idaho

61% match

Fiber Dial Room Refurbishment

Closes 12/11/2026Opened 2/25/2026

Santa Maria-Bonita School District·California

61% match

BONITA SCHOOL DRINKING WATER IMPROVEMENTS

Closes 12/14/2026Opened 10/30/2026

U.S. Department Of The Interior·New Mexico

61% match

C--BGNDRF PIPING UPGRADES

Closes 11/13/2026Opened 10/7/2026

Northern Virginia Community College·Virginia

61% match

260-B5260-007 CM Engineering Lab & Pantry

Closes 11/9/2026Opened 10/6/2026

University of Wyoming·Wyoming

61% match

Agriculture Building Lysimeter Chamber Decommissioning

Closes 11/20/2026Opened 10/26/2026

Pennsylvania Department of Health·Pennsylvania

61% match

Pennsylvania Joint Laboratory Facility

Closes 12/25/2026Opened 4/24/2026

Town of Jupiter·Florida

61% match

RO Plant Improvements & Membrane Replacements (W2010)

Closes 11/10/2026Opened 10/6/2026

Eden Prairie Schools·Minnesota

61% match

Transportation Building Fuel Tanks Replacement

Closes 11/24/2026Opened 10/29/2026