Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Georgia guideGeorgia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Georgia
  4. ›Construction
  5. ›Hollonville Meter Connection at Hollonville Road Division…

Georgia Pike County Water & Sewerage Authority·Georgia

Hollonville Meter Connection at Hollonville Road Division I & II

Closes 9/11/2026$500k – $2MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Pike County Water & Sewerage Authority is seeking bids for the construction of the Hollonville Meter Connection at Hollonville Road Division I & II. The project involves furnishing all labor, materials, and equipment necessary to construct the proposed connection, including a metered connection to the City of Griffin Transmission line, yard piping, valves, and erosion control. The project is expected to be completed within 90 consecutive calendar days to substantial completion, and 104 consecutive calendar days to final completion. The successful bidder will be required to provide a Performance Bond and Payment Bond, each in the amount of 100% of the contract amount. • The project includes Division I - Metered Connection to the City of Griffin Transmission line complete with Pressure reducing valve, meter, and double detector check valve assembly located in two vaults, yard piping, valves, Jack & bore steel casing and all associated measures for the complete project. • Division II includes approximately 1,300 L.F of 8 PVC Watermain, fire hydrants, gate valves, erosion control, and all associated measures for a complete project. • The project will be funded by a grant from the ARPA Grant Funds & Local Funds. • The Owner reserves the right to reject any or all bids and to waive informalities.

Attached files

Contact

Shon Hampton(Buyer Contact)

[email protected]

(229) 388-8823

Key dates

Opened
8/12/2026
Closes
9/11/2026
Duration
104 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237110
Solicitation №
PE-33955-NONST-2026-000000003

Budget estimate

$500,000 – $2,000,000

The budget for this project can be estimated based on the scope of work and the materials required. The project involves the construction of a metered connection, yard piping, valves, and erosion control, as well as the installation of approximately 1,300 L.F of 8 PVC Watermain, fire hydrants, and gate valves. Considering the costs of materials, labor, and equipment, a rough estimate for the project could be between $500,000 to $2,000,000. However, this is a wide range and the actual budget could be higher or lower, depending on various factors such as the complexity of the project, the location, and the contractor's experience.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Georgia Pike County Water & Sewerage Authority·Georgia

Top match · 67%

City of Griffin Meter Connections Division I Bottoms Road & Division II Flat Shoals Road

Closes 11/13/2026Opened 10/14/2026

The Ohio State University·Ohio

64% match

OSU-255480 JOC HHW and CHW Meter Replacement

Closes 11/12/2026Opened 10/8/2026

Rural Community Water District of Georgetown County·South Carolina

64% match

Water Meter Pit Installation

Closes 11/23/2026Opened 10/27/2026

Massachusetts Peabody Municipal Light Plant·Massachusetts

63% match

Meter Exchange Services

Closes 11/30/2026Opened 10/26/2026

City of Gould·Arkansas

62% match

RFP # 24RU40001 – Contract C – Water Meters

Closes 11/2/2026Opened 10/18/2026

City of Aumsville·Oregon

62% match

Automatic Metering Infrastructure Supply & Installation

Closes 11/17/2026Opened 10/20/2026

Hilton Head Public Service District·South Carolina

62% match

Hilton Head Public Service District Meter Replacement RFQ

Closes 11/10/2026Opened 10/8/2026

City of Philadelphia·Pennsylvania

62% match

METER READERS

Closes 11/3/2026Opened 10/14/2026

City of Hollywood·Florida

62% match

Meter Transmission Unit / VertexOne Consumer Portal

Closes 11/2/2026Opened 10/26/2026

City of Bedford, TX·Texas

62% match

Water Meter Installations

Closes 11/12/2026Opened 10/9/2026

Massachusetts Town of Kingston·Massachusetts

61% match

Water Meter and Advanced Metering Analytics Maintenance

Closes 11/4/2026Opened 10/15/2026

City of St. Charles·Illinois

61% match

Advanced Metering Infrastructure (AMI)

Closes 12/3/2026Opened 9/30/2026

Little Blue NRD·Nebraska

61% match

LBNRD Water Meter Replacements

Closes 12/3/2026Opened 10/23/2026

City of Phoenix·Arizona

61% match

Flow Meters and Level Meters Supplemental

Closes 11/5/2026Opened 10/15/2026

Virginia State Police·Virginia

60% match

156-27-048 Division 2 Culpeper Locations : HVAC/Mechanical Preventative Maint. and On-Call Repair

Closes 11/24/2026Opened 10/19/2026

NYS Rockland County·New York

60% match

Flow Meter Inspection, Calibration and Testing Services

Closes 11/16/2026Opened 10/23/2026

City of Charlotte·North Carolina

60% match

Service Water Improvements and Flow Meter Modifications

Rolling / TBD closeOpened 1/31/2026

LA Water & Power·California

60% match

146628 OWENS LAKE ABB WATERMASTER ELECTROMAGNETIC FLOW METERS

Closes 11/4/2026Opened 10/20/2026

Georgia City of Oxford·Georgia

60% match

City of Oxford Water and Electric Meter Replacement

Closes 11/4/2026Opened 9/29/2026

City of Charlotte·North Carolina

60% match

Mallard Connector Main

Rolling / TBD closeOpened 3/1/2027

City of Pasadena·California

60% match

Advanced Metering Infrastructure (AMI) System and Installation Services

Closes 12/1/2026Opened 10/13/2026

City of Sylvania, OH·Ohio

60% match

Monroe Street Lighting Improvements (Harroun Road to Acres Road)

Closes 11/3/2026Opened 10/12/2026

City of Cincinnati·Ohio

60% match

Hopple Street HAM CR 163 5.5 - PID 121735

Closes 11/12/2026Opened 9/10/2026