The Pike County Water & Sewerage Authority is seeking bids for the construction of the Hollonville Meter Connection at Hollonville Road Division I & II. The project involves furnishing all labor, materials, and equipment necessary to construct the proposed connection, including a metered connection to the City of Griffin Transmission line, yard piping, valves, and erosion control. The project is expected to be completed within 90 consecutive calendar days to substantial completion, and 104 consecutive calendar days to final completion. The successful bidder will be required to provide a Performance Bond and Payment Bond, each in the amount of 100% of the contract amount.
• The project includes Division I - Metered Connection to the City of Griffin Transmission line complete with Pressure reducing valve, meter, and double detector check valve assembly located in two vaults, yard piping, valves, Jack & bore steel casing and all associated measures for the complete project.
• Division II includes approximately 1,300 L.F of 8 PVC Watermain, fire hydrants, gate valves, erosion control, and all associated measures for a complete project.
• The project will be funded by a grant from the ARPA Grant Funds & Local Funds.
• The Owner reserves the right to reject any or all bids and to waive informalities.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.