The Clayton County Water Authority (CCWA) is seeking a licensed utility contractor to replace approximately 14,453 linear feet of existing 30‑inch gravity‑flow sanitary sewer with new 36‑inch and 30‑inch pipe at the Camp Creek outfall. The work includes excavation, pipe installation (both trench and trenchless methods), multiple reconnections of smaller sewers, manhole construction, backfill, compaction, erosion and sediment control, and associated site work. The project is funded by the Georgia Environmental Finance Authority (GEFA) and must comply with state and federal environmental regulations. Bidders must attend a mandatory pre‑bid meeting/site visit on September 15, 2026, submit questions by September 24, 2026, and deliver sealed bids electronically by October 8, 2026. The contract will be awarded to the lowest responsive, responsible bidder.
• Replace 14,453 ft of 30‑in. sanitary sewer with new 36‑in. and 30‑in. pipe
• Perform reconnections of smaller existing sewers
• Includes excavation, pipe laying, manhole installation, backfill, and erosion control
• Funded by GEFA; must meet GEFA and state environmental conditions
• Mandatory pre‑bid meeting/site visit on 9/15/2026 (attendance required)
• Questions due 9/24/2026; bid deadline 10/8/2026 (electronic submission)
• Award to lowest responsive, responsible bidder