The University of California Los Angeles is seeking a qualified subcontractor to provide doors, frames, and hardware for the renovation of the Acosta Operations Center. The scope includes interior demolition, installation of new interior partitions, doors, door frames (including sidelite frames), window frames, hardware, access‑door assemblies, and integration with existing mechanical, electrical, fire‑sprinkler, and fire‑alarm systems. The work must comply with UC Fair Wage, California licensing (C‑61/D‑28), LEED‑ID+C certification, and hazardous‑material abatement requirements, and will be performed in an occupied building with potential restricted‑hours work.
• Interior demolition of offices 121A‑F (~2,321 asf) and full interior fit‑out
• Supply and install doors, door frames, sidelite frames, window frames, hardware, and access‑door assemblies
• Coordinate with mechanical, electrical, fire‑sprinkler, and fire‑alarm systems, including a dedicated cooling system for server loads and a double‑interlock pre‑action sprinkler system
• Perform work in an occupied facility with possible night/weekend restrictions and required LEED‑ID+C compliance