The project calls for the final construction phase of Taxiway B at Delaware Coastal Airport, adding roughly 1,200 ft of taxiway on the north end and 1,000 ft on the south end to complete the parallel taxiway system. Work includes full‑width pavement construction, earthwork, drainage, storm‑water management, airfield lighting, signage, and pavement markings, all to current FAA standards and Buy‑America requirements. The bid is a sealed‑bid, fixed‑price solicitation, with a bid guarantee of at least 10 % of the total bid amount and required performance and payment bonds. The opportunity is federally‑assisted (FAA) and subject to numerous federal procurement statutes.
• Approx. 2,200 ft of new taxiway pavement (asphalt surface, sub‑base, drainage, lighting, markings).
• Comprehensive site work: silt‑fence erosion control, muck excavation, sub‑base placement, utility relocations, HDPE and reinforced‑concrete pipe installations.
• Full airfield infrastructure: lighting, signage, reflective markings, and compliance with the Build America, Buy America Act.