Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • North Carolina guideNorth Carolina Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More engineering services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›North Carolina
  4. ›Engineering Services
  5. ›Advanced Metering Infrastructure (AMI) System: Integrated…

North Carolina Town of Granite Falls·North Carolina

Advanced Metering Infrastructure (AMI) System: Integrated Water Metering and Existing Electric Meter Reading System

Closes 10/22/2026$3M – $7MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Town of Granite Falls, NC is seeking a single prime contractor to design, supply, install, integrate, and support a comprehensive Advanced Metering Infrastructure (AMI) that will read both existing Itron electric meters (≈2,715 units, 600‑700 AMI‑compatible) and all water meters (≈2,836 units). The scope includes communications network hardware (collectors, gateways, repeaters, antennas), head‑end software, integration with the town’s Tyler ERP Pro 10 billing system, GPS tagging of water meters, installation of AMI registers/endpoints on existing Neptune T‑10 water meters (or full replacements where needed), training, testing, commissioning, and ongoing maintenance. Funding is phased, requiring detailed unit pricing for retrofit versus full replacement and allowing the town to scale implementation based on budget. • Provide a town‑wide AMI communications network • Integrate water‑meter data and existing electric‑meter data into a single platform • Interface with Tyler ERP Pro 10 billing • Offer phased rollout with unit‑price options • Deliver training, documentation, and long‑term support.

Attached files

Contact

Eric Williams(Director of Public Utilities)

[email protected]

(828) 396-3131

Key dates

Opened
10/19/2026
Questions due
11/9/2026
Pre-bid meeting
11/3/2026
Closes
10/22/2026

Last updated

Details

Type
Request for Proposal
Industry
Engineering Services
NAICS
541512
Solicitation №
445-2026-2

Budget estimate

$3,000,000 – $7,000,000

No total contract value is disclosed. Based on comparable municipal AMI projects for towns of similar size (≈5,500 total meters) that include network hardware, software licensing, integration, and phased deployment, total costs typically range from $3 million to $7 million. The lower bound assumes a minimal phased rollout focusing on communications and retrofit; the upper bound reflects full water‑meter replacement, extensive hardware, and multi‑year support. Factors influencing the final amount include the proportion of meters retrofitted vs. replaced, the depth of integration with Tyler ERP, and the selected optional services (e.g., advanced analytics, remote shut‑off).

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Pasadena·California

Top match · 85%

Advanced Metering Infrastructure (AMI) System and Installation Services

Closes 12/1/2026Opened 10/13/2026

City of St. Charles·Illinois

84% match

Advanced Metering Infrastructure (AMI)

Closes 12/3/2026Opened 9/30/2026

City of Punta Gorda·Florida

83% match

SVC-AMI/1626 - Advanced Metering Infrastructure (AMI)

Closes 11/20/2026Opened 9/25/2026

City of Aumsville·Oregon

80% match

Automatic Metering Infrastructure Supply & Installation

Closes 11/17/2026Opened 10/20/2026

City of Boca Raton·Florida

79% match

Installation and/or Replacement of Potable and, or Reclaimed Water Meters with AMI Transponders

Closes 11/23/2026Opened 10/20/2026

City of Boca Raton·Florida

79% match

Installation and/or Replacement of Potable and, or Reclaimed Water Meters with AMI Transponders

Closes 11/23/2026Opened 10/20/2026

City of Punta Gorda·Florida

77% match

SVC-AMI/1626 - Advanced Metering Infrastructure (AMI) Water Utilities System

Closes 11/20/2026Opened 10/22/2026

Washington Suburban Sanitary Commission·Maryland

77% match

Request for Qualification - AMI Materials

Closes 12/11/2026Opened 9/23/2026

Washington Suburban Sanitary Commission, MD·Maryland

77% match

Request for Qualification - AMI Materials

Closes 12/11/2026Opened 9/23/2026

Massachusetts Town of Kingston·Massachusetts

77% match

Water Meter and Advanced Metering Analytics Maintenance

Closes 11/4/2026Opened 10/15/2026

City of Lodi·California

73% match

Coming Soon! January 2027 AMI RFI

Rolling / TBD closeOpened 10/1/2026

LA Water & Power·California

73% match

146628 OWENS LAKE ABB WATERMASTER ELECTROMAGNETIC FLOW METERS

Closes 11/4/2026Opened 10/20/2026

City of Bedford, TX·Texas

73% match

Water Meter Installations

Closes 11/12/2026Opened 10/9/2026

City of Hollywood·Florida

73% match

Meter Transmission Unit / VertexOne Consumer Portal

Closes 11/2/2026Opened 10/26/2026

Georgia City of Oxford·Georgia

72% match

City of Oxford Water and Electric Meter Replacement

Closes 11/4/2026Opened 9/29/2026

City of Charlotte·North Carolina

72% match

Service Water Improvements and Flow Meter Modifications

Rolling / TBD closeOpened 1/31/2026

City of Winnebago·Minnesota

71% match

Winnebago, City of Water Meter Replacement BMI Project No. 26X146003

Closes 11/18/2026Opened 10/25/2026

City of Holly Grove·Arkansas

71% match

City of Holly Grove Water System Improvements – Water Meter Replacement

Closes 11/18/2026Opened 10/25/2026

Massachusetts Peabody Municipal Light Plant·Massachusetts

71% match

Meter Exchange Services

Closes 11/30/2026Opened 10/26/2026

Arlington County Government·Virginia

70% match

ANNUAL FLOW METER CALIBRATION, INSTALLATION, REPAIR AND REPLACEMENT

Closes 11/9/2026Opened 10/30/2026

Town of Lexington·South Carolina

70% match

SERVICES FOR POTABLE WATER SYSTEM HYDRAULIC MODELING AND PROGRAM MANAGEMENT

Closes 11/5/2026Opened 9/16/2026

City of Oshkosh·Wisconsin

70% match

IFB - REMOVAL/INSTALLATION OF TWO WATER METER TEST BENCHES WITH AMS TECHNOLOGY

Closes 11/10/2026Opened 10/16/2026

Rural Community Water District of Georgetown County·South Carolina

69% match

Water Meter Pit Installation

Closes 11/23/2026Opened 10/27/2026

City of Phoenix·Arizona

69% match

Flow Meters and Level Meters Supplemental

Closes 11/5/2026Opened 10/15/2026

City of Philadelphia·Pennsylvania

69% match

METER READERS

Closes 11/3/2026Opened 10/14/2026