The project involves the implementation of a Corrective Action Plan (CAP) at 30 Henry Street in Bellows Falls, Vermont. The CAP is necessary due to the presence of environmental contaminants in the soil and groundwater at the site. The project includes tasks such as stored materials removal and disposal, basement foundation repairs, installation of a vapor barrier and sub-membrane depressurization system, and replacement of a rotted structural support beam. The project is expected to be completed as soon as possible, with a target completion date of June 2026.
• The project is funded by the US EPA Revolving Loan Fund (RLF) managed by the Windham Regional Commission (WRC).
• The project requires compliance with the Davis-Bacon and Related Acts (DBRA) and the Build America, Buy America Act (BABAA).
• The contractor must submit a bid proposal form, bid specification documents, and other required documents.
• The contractor must also comply with health and safety requirements, including the development of a site-specific health and safety plan (HASP).
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.