Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›MAHG251029 Repair Water Tower #8

U.S. Department Of Defense·Mississippi

MAHG251029 Repair Water Tower #8

Closes 7/17/2026$200k – $500kSole Source
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The US Air Force is seeking information from potential contractors for the repair of Water Tower #8 at Keesler AFB, MS. The scope of work includes inspection and repairs of the water tower and components, repairs of failing drain lines, disinfection of the tower tank, interior and exterior painting, and repairs to the existing safety climbing devices. The goal is to have a fully operational water tower that meets all AWWA, OSHA, and UFC standards. • The period of performance is anticipated to be 90 calendar days. • The water tower must be compliant with all AWWA, OSHA, and UFC standards. • The contractor must provide a brief statement of capability to perform the work, along with their company's CAGE code, UEI, and business size/socioeconomic status. • The contractor may also provide standard spec sheets or brochures for the systems they propose.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Taylor Williams

[email protected]

(228) 377-1814

Key dates

Opened
7/14/2026
Closes
7/17/2026
Duration
90 days

Last updated

Details

Type
Sole Source
Industry
Construction
NAICS
237110
Solicitation №
MAHG251029

Budget estimate

$200,000 – $500,000

The budget for this project is difficult to estimate without more specific information on the scope of work and materials required. However, considering the project involves repairs to a water tower, including painting, disinfection, and safety device repairs, the cost could range from $200,000 to $500,000. This estimate is based on the assumption that the repairs will require specialized labor and equipment, and that the materials needed will be of moderate to high cost.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Medina County, OH Sanitary Engineering·Ohio

Top match · 73%

Chatham Water Tower Rehabilitation 2027

Closes 11/6/2026Opened 10/16/2026

City of Lime Springs·Iowa

71% match

Lime Springs, City of 100,000 Gallon Elevated Tower Reconditioning 26X.143612

Closes 11/19/2026Opened 10/29/2026

City of Eau Claire·Wisconsin

71% match

Cleaning, Repairing, & Painting of Folsom Water Tower

Closes 12/3/2026Opened 10/26/2026

City of Altoona·Iowa

68% match

City of Altoona, IA - Old Town Water Tower Rehabilitation

Closes 11/10/2026Opened 10/21/2026

County of Hernando·Florida

68% match

Hernando Beach Water Tower Maintenance

Closes 11/16/2026Opened 9/30/2026

New York City Department of Design and Construction·New York

68% match

EMERGENCY WATER MAINS

Rolling / TBD closeOpened 3/12/2021

City of South Hutchinson·Kansas

68% match

2025 Water Tower Improvements for the City of South Hutchinson

Closes 11/18/2026Opened 10/28/2026

U.S. Department Of Defense·Mississippi

68% match

Arkabutla Lake Water Plant Rehab and Pre-fabricated Metal Building Installation

Closes 11/6/2026Opened 10/21/2026

Omaha Public Schools·Nebraska

67% match

Marrs Cooling Tower Replacement

Closes 12/1/2026Opened 10/26/2026

City of Hollywood·Florida

67% match

Water Treatment Plant Maintenance Package ‘A’; Project No. 25-4261

Closes 11/25/2026Opened 10/20/2026

New York City Department of Design and Construction·New York

67% match

Emergency Water Main Work

Rolling / TBD closeOpened 4/27/2026

City of Ontario·California

67% match

UT 1065 FY2026-27 Water Main Improvements

Closes 11/18/2026Opened 10/14/2026

U.S. Department Of Defense·United States of America

67% match

48--ACTUATOR,HYDRAULIC-, IN REPAIR/MODIFICATION OF

Closes 11/30/2026Opened 10/29/2026

Nevada Department of Human Services·Nevada

67% match

Water Well Repair

Closes 11/3/2026Opened 10/20/2026

Ohio Department of Public Safety·Ohio

67% match

DPS-260008 (25-26053) Shipley Cooling Tower Replacement

Closes 11/10/2026Opened 10/15/2026

New York City Department of Environmental Protection·New York

67% match

82626B0054-BEDC-PS-318 Reconstruction of Paerdegat Pumping Station

Closes 12/16/2026Opened 10/21/2026

New York City Department of Design and Construction·New York

67% match

Emergency Water Main Work

Rolling / TBD closeOpened 4/24/2025

U.S. Department Of Defense·United States of America

67% match

Arcadia Wet Well Rehabilitation

Closes 11/9/2026Opened 10/8/2026

Massachusetts Town of Westborough·Massachusetts

67% match

27-2100 IFB Route 9 Water Main Rehabilitation-Phase I

Closes 11/19/2026Opened 10/28/2026

New York City Department of Environmental Protection·New York

67% match

82626B0042-BWT-WI-323 Reconstruction of MSP Cone Check Valves, Actuators and Discharge Piping at Wards Island WWTP

Closes 1/4/2027Opened 8/31/2026

North Carolina City of Asheville·North Carolina

66% match

Water Line Repair for Wood Ave and Misc. Insulation Replacement

Closes 11/5/2026Opened 10/1/2026

Georgia Macon Water Authority·Georgia

66% match

AWTP-(2) 1000 Hp Reservoir Vertical Turbine

Closes 11/17/2026Opened 10/2/2026

City of Bedford, TX·Texas

66% match

Water Meter Installations

Closes 11/12/2026Opened 10/9/2026

City of Bellevue·Washington

66% match

2027 Phase 1 Water Main Replacement

Closes 11/12/2026Opened 10/22/2026

City of Monterey·California

66% match

FIRE STATION 13 TRAINING TOWER REPAIR (CIP2303)

Closes 12/1/2026Opened 10/22/2026