Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›MAHG251029 Repair Water Tower #8

U.S. Department Of Defense·Mississippi

MAHG251029 Repair Water Tower #8

Closes 9/18/2026$200k – $500kRequest for Quotation
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The U.S. Air Force is soliciting bids to repair Water Tower #8 located at Keesler Air Force Base, Mississippi. This is a service‑disabled veteran‑owned small‑business set‑aside RFQ with a firm‑fixed‑price contract. The contractor must begin work within 10 days of award and complete the repair within 270 calendar days (approximately 9 months). A mandatory site‑visit is scheduled for 27 August 2026; pass requests must be submitted by 25 August 2026. Offers are due sealed by 11:00 AM local time on 15 September 2026. The contract will require compliance with numerous FAR/DFARS clauses, including insurance, anti‑terrorism training, and electronic invoicing via WAWF. • Scope: Repair of Water Tower #8 per attached specifications and drawings. • Location: Keesler AFB, MS (81st Civil Engineering Squadron Building 4705). • Set‑aside: 100 % Service‑Disabled Veteran‑Owned Small Business. • Performance period: 01 Oct 2026 – 28 Jun 2027 (270 days). • Submission: Sealed offers, 1 copy, due 15 Sep 2026, 11:00 AM CST. • Pre‑bid/site visit: 27 Aug 2026, 2 PM CST (optional but strongly encouraged). • Required bonds: Performance and payment bonds may be required (see Section 12). • Evaluation factors: Price, technical approach, past performance.

Attached files

Contact

TSgt Taylor Williams(Contract Specialist)

[email protected]

(228) 377-1814

Key dates

Opened
8/25/2026
Pre-bid meeting
8/27/2026
Site visit
8/27/2026
Closes
9/18/2026
Duration
270 days

Last updated

Details

Type
Request for Quotation
Industry
Construction
NAICS
237110
Solicitation №
FA301026Q0033

Budget estimate

$200,000 – $500,000

No contract value is disclosed. Based on typical government water‑tower repair contracts of similar size and complexity, the award is likely to fall between $200,000 and $500,000. The estimate considers the need for specialized civil‑engineering labor, materials, equipment mobilization, and the 270‑day performance window, as well as the small‑business set‑aside which often caps contract values near the $500K threshold for this NAICS segment.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Medina County, OH Sanitary Engineering·Ohio

Top match · 73%

Chatham Water Tower Rehabilitation 2027

Closes 11/6/2026Opened 10/16/2026

City of Lime Springs·Iowa

71% match

Lime Springs, City of 100,000 Gallon Elevated Tower Reconditioning 26X.143612

Closes 11/19/2026Opened 10/29/2026

City of Eau Claire·Wisconsin

71% match

Cleaning, Repairing, & Painting of Folsom Water Tower

Closes 12/3/2026Opened 10/26/2026

City of Altoona·Iowa

68% match

City of Altoona, IA - Old Town Water Tower Rehabilitation

Closes 11/10/2026Opened 10/21/2026

County of Hernando·Florida

68% match

Hernando Beach Water Tower Maintenance

Closes 11/16/2026Opened 9/30/2026

New York City Department of Design and Construction·New York

68% match

EMERGENCY WATER MAINS

Rolling / TBD closeOpened 3/12/2021

City of South Hutchinson·Kansas

68% match

2025 Water Tower Improvements for the City of South Hutchinson

Closes 11/18/2026Opened 10/28/2026

U.S. Department Of Defense·Mississippi

68% match

Arkabutla Lake Water Plant Rehab and Pre-fabricated Metal Building Installation

Closes 11/6/2026Opened 10/21/2026

Omaha Public Schools·Nebraska

67% match

Marrs Cooling Tower Replacement

Closes 12/1/2026Opened 10/26/2026

City of Hollywood·Florida

67% match

Water Treatment Plant Maintenance Package ‘A’; Project No. 25-4261

Closes 11/25/2026Opened 10/20/2026

New York City Department of Design and Construction·New York

67% match

Emergency Water Main Work

Rolling / TBD closeOpened 4/27/2026

City of Ontario·California

67% match

UT 1065 FY2026-27 Water Main Improvements

Closes 11/18/2026Opened 10/14/2026

U.S. Department Of Defense·United States of America

67% match

48--ACTUATOR,HYDRAULIC-, IN REPAIR/MODIFICATION OF

Closes 11/30/2026Opened 10/29/2026

Nevada Department of Human Services·Nevada

67% match

Water Well Repair

Closes 11/3/2026Opened 10/20/2026

Ohio Department of Public Safety·Ohio

67% match

DPS-260008 (25-26053) Shipley Cooling Tower Replacement

Closes 11/10/2026Opened 10/15/2026

New York City Department of Environmental Protection·New York

67% match

82626B0054-BEDC-PS-318 Reconstruction of Paerdegat Pumping Station

Closes 12/16/2026Opened 10/21/2026

New York City Department of Design and Construction·New York

67% match

Emergency Water Main Work

Rolling / TBD closeOpened 4/24/2025

U.S. Department Of Defense·United States of America

67% match

Arcadia Wet Well Rehabilitation

Closes 11/9/2026Opened 10/8/2026

Massachusetts Town of Westborough·Massachusetts

67% match

27-2100 IFB Route 9 Water Main Rehabilitation-Phase I

Closes 11/19/2026Opened 10/28/2026

New York City Department of Environmental Protection·New York

67% match

82626B0042-BWT-WI-323 Reconstruction of MSP Cone Check Valves, Actuators and Discharge Piping at Wards Island WWTP

Closes 1/4/2027Opened 8/31/2026

North Carolina City of Asheville·North Carolina

66% match

Water Line Repair for Wood Ave and Misc. Insulation Replacement

Closes 11/5/2026Opened 10/1/2026

Georgia Macon Water Authority·Georgia

66% match

AWTP-(2) 1000 Hp Reservoir Vertical Turbine

Closes 11/17/2026Opened 10/2/2026

City of Bedford, TX·Texas

66% match

Water Meter Installations

Closes 11/12/2026Opened 10/9/2026

City of Bellevue·Washington

66% match

2027 Phase 1 Water Main Replacement

Closes 11/12/2026Opened 10/22/2026

City of Monterey·California

66% match

FIRE STATION 13 TRAINING TOWER REPAIR (CIP2303)

Closes 12/1/2026Opened 10/22/2026