The City of Bryan, Texas, is seeking bids for the construction of the Brushy Creek Substation. The project includes site work, concrete, grounding, electrical raceway system, control building, steel, yard equipment, cable and accessories, power, lighting, and control devices, installation of major substation equipment, and field testing. The contractor will be responsible for performing all site demolition work, soil amendments, site grading, compaction, gates and gate operators, grading, and final layer of white rock as indicated on the contract drawings. The contractor will also be responsible for receiving, unloading, moving, storing, and erecting all owner-furnished materials and materials provided by the contractor.
Some key features of the project include:
• Site work, including earthwork, fencing, and landscaping
• Concrete work, including foundations, walls, and slabs
• Electrical work, including installation of power circuit breakers, cables, and conduits
• Installation of a pre-engineered control building
• Testing and commissioning of all equipment and systems
The project is expected to be completed by January 28, 2028.