Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Texas guideTexas Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More manufacturing bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Texas
  4. ›Manufacturing
  5. ›GP&L Oates Rd. Substation Steel

City of Garland·Texas

GP&L Oates Rd. Substation Steel

Closes 10/29/2026$500k – $2.5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Garland’s Power & Light department is soliciting sealed bids for the design, fabrication, testing, packaging, shipping and delivery of tubular steel structures for the Oates Road Substation. The scope includes complete substation steel frames, anchor bolts, grounding hardware, and associated accessories, all to be hot‑dip galvanized and conforming to a long list of AISC, ASCE, ASTM, ANSI and other industry standards. Bidders must be manufacturers with at least five years’ experience fabricating similar substation structures, possess in‑house galvanizing capability, and be located within 1,200 mi of Garland, TX. The contract requires a five‑year warranty, a required delivery date of 09/06/2027, and a five‑percent excess of fastening hardware. A pre‑bid virtual meeting is scheduled for 10/14/2026.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Teresa Smith(Purchasing Manager)

(972) 205-2421

Key dates

Opened
10/9/2026
Questions due
10/26/2026
Pre-bid meeting
10/14/2026
Closes
10/29/2026
Duration
11 months

Last updated

Details

Type
Invitation for Bid
Industry
Manufacturing
NAICS
332312
Solicitation №
REQ00003230 Addendum 1

Budget estimate

$500,000 – $2,500,000

Based on typical costs for custom‑fabricated, hot‑dip galvanized substation steel structures (including design, material, labor, testing, shipping and a five‑year warranty), a project of this size usually falls in the $0.5 M‑$2.5 M range. The low end assumes a modest number of structures and standard steel grades; the high end reflects larger or more complex assemblies, higher‑grade alloys, extensive testing, and logistics to the delivery site.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

NYS MTA - Metro-North Railroad·New York

Top match · 66%

REPLACEMENT OF SEVEN (7) POWER SUBSTATION ROOFS

Closes 11/17/2026Opened 10/2/2026

City of Danville·Virginia

64% match

QB 26-27-016 Swedwood Subtation Package - Bid Tab

Closes 11/8/2026Opened 10/28/2026

City of Gallup·New Mexico

64% match

Turnkey-Engineering, Procurement and Construction (EPC) for New Carbon Coal Electrical Substation

Closes 11/6/2026Opened 7/24/2026

City of Richland·Washington

64% match

Tapteal Substation Bank 2 Oil Leak Repair

Closes 11/6/2026Opened 10/1/2026

Massachusetts City of Boston·Massachusetts

63% match

SLE - STEEL FRAMES and COVERS

Closes 11/12/2026Opened 10/26/2026

Snohomish County PUD·Washington

63% match

Canyon Park Substation Dead End & Strain Bus Support Structures and Anchorage

Closes 11/10/2026Opened 10/27/2026

University of Maryland - Baltimore·Maryland

63% match

Electrical Substation Expansion and Improvements at Towson University

Closes 12/8/2026Opened 10/28/2026

City of Cincinnati·Ohio

63% match

Hopple Street HAM CR 163 5.5 - PID 121735

Closes 11/12/2026Opened 9/10/2026

City of Springfield·Illinois

63% match

Alpha Substation Construction (J1610 Project)

Closes 11/5/2026Opened 10/6/2026

U.S. Department Of Defense·Illinois

63% match

Thomas J O Brien Lock and Dam Major Rehabilitation - Construction, Chicago, Cook County, Illinois

Closes 11/27/2026Opened 10/27/2026

Port of Lake Charles·Louisiana

63% match

Industrial Park East Rail Extension & Trans‑Loading Yard

Closes 11/19/2026Opened 10/13/2026

U.S. Department Of Homeland Security·California

63% match

USCGC TERRELL HORNE – SEWAGE PIPING RENEWAL

Closes 11/11/2026Opened 10/28/2026

Eastern Kentucky University·Kentucky

62% match

Trade Service Agreement - Substation Breaker Maintenance

Closes 11/6/2026Opened 10/19/2026

Santa Clara Valley Transportation Authority·California

62% match

Pre-Qualification: Guadalupe Light Rail Vehicle Wash Improvements

Closes 11/16/2026Opened 7/16/2026

Port of Stockton·California

62% match

Pre-Construction Services Long Lead Double Track (LLDT) Rail

Closes 11/10/2026Opened 10/9/2026

City of Cincinnati·Ohio

62% match

Hopple Street HAM CR 163 5.5 - PID 121735

Closes 11/6/2026Opened 10/9/2026

U.S. Department Of Defense·Illinois

62% match

STEEL TUBE

Closes 11/9/2026Opened 10/30/2026

Washington Parks & Recreation Commission, State·Washington

62% match

SW Region Cross Bracing Fabrication

Closes 12/15/2026Opened 10/29/2026

Maryland Transit Administration·Maryland

62% match

Metro Traction Power Substation Emergency Trip Stations (TPSS ETS) Installation at Various Locations [T-1564-0150]

Closes 11/19/2026Opened 10/1/2026

City of Cincinnati·Ohio

62% match

Hopple Street HAM CR 163 5.5 - PID 121735

Closes 11/12/2026Opened 10/27/2026

Southeastern Pennsylvania Transportation Authority·Pennsylvania

62% match

RAIL TIES

Closes 12/31/2026Opened 4/11/2026

City of San Diego·California

62% match

Gompers Prep 47th St Safety Enhancement

Closes 11/19/2026Opened 10/20/2026

City of Chicago·Illinois

62% match

Eugene Sawyer Water Purification Plant (ESWPP) Low Lift Pump Building, Chemical Building, and Garage Roof Replacement

Closes 12/18/2026Opened 10/12/2026

City of St. Charles·Illinois

62% match

Substation Transformer Reconditioning - 3T3

Closes 11/20/2026Opened 10/28/2026

Washington Lewis County Public Utility District·Washington

62% match

Substation Control Enclosure for Jackson Highway Substation

Closes 11/19/2026Opened 10/14/2026