Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • North Carolina guideNorth Carolina Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›North Carolina
  4. ›Construction
  5. ›Wayne Community College - MASTER METER AND BOOSTER PUMP…

North Carolina Wayne Community College·North Carolina

Wayne Community College - MASTER METER AND BOOSTER PUMP ADDITION

Closes 12/8/2025$250k – $600kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Wayne Community College is seeking bids for the construction of a Master Meter and Booster Pump Addition project. The project includes the addition of a master meter, master back flow preventer, and packaged domestic and fire booster pump system and shelter, as well as an extension of approximately 250 LF of water main, installation of nine 10-inch isolation valves, and connection to existing power. The project is expected to last 180 days. The bid documents can be obtained from the Issuing Office, and a pre-bid conference will be held on November 19, 2025. The bid submission deadline is December 8, 2025. • The project requires the installation of a master meter, master back flow preventer, and packaged domestic and fire booster pump system and shelter. • The project includes an extension of approximately 250 LF of water main. • The project requires the installation of nine 10-inch isolation valves. • The project requires connection to existing power. • The project is expected to last 180 days. • The bid documents can be obtained from the Issuing Office. • A pre-bid conference will be held on November 19, 2025. • The bid submission deadline is December 8, 2025.

Attached files

Contact

Derek Hunter(Vice President, Operations)

[email protected]

(919) 739-7020

Key dates

Opened
11/10/2025
Pre-bid meeting
11/19/2025
Site visit
11/19/2025
Closes
12/8/2025
Duration
180 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237110
Solicitation №
131-70141

Budget estimate

$250,000 – $600,000

The budget for this project can be estimated based on the scope of work, which includes the installation of a master meter, master back flow preventer, and packaged domestic and fire booster pump system and shelter, as well as an extension of approximately 250 LF of water main. The cost of materials and labor for this project can range from $200,000 to $500,000, depending on the complexity of the project and the number of workers required. Additionally, the cost of equipment and supplies, such as pipes, valves, and pumps, should also be considered. Therefore, a reasonable estimate for the budget for this project would be between $250,000 and $600,000.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

The Ohio State University·Ohio

Top match · 66%

OSU-255480 JOC HHW and CHW Meter Replacement

Closes 11/12/2026Opened 10/8/2026

City of Charlotte·North Carolina

66% match

Service Water Improvements and Flow Meter Modifications

Rolling / TBD closeOpened 1/31/2026

Brazos Valley·Texas

65% match

Well 6 Capacity Enhancement

Closes 11/12/2026Opened 10/21/2026

City of Fort Wayne·Indiana

63% match

Electrical Distribution Equipment

Closes 11/10/2026Opened 10/15/2026

State University of New York (SUNY)·New York

63% match

Chiller/Boiler Upgrades Johnson City Center - Mechanical & Plumbing

Closes 11/12/2026Opened 10/21/2026

North Carolina Central University·North Carolina

63% match

NC Central University

Closes 11/12/2026Opened 10/13/2026

Wayne Township·New Jersey

63% match

Engineering Services for the Community Center HVAC Upgrades

Closes 11/12/2026Opened 8/31/2026

Trident Technical College·South Carolina

63% match

TTC - Palmer Campus Chiller Replacement *REVISED ATTACHED DOCUMENT**

Closes 11/5/2026Opened 10/13/2026

The Metropolitan District·Connecticut

63% match

FLOW METER AND RAIN GAUGE REPLACEMENT

Closes 11/5/2026Opened 10/5/2026

Mississippi Alcorn State University·Mississippi

63% match

Generator Project – Walter Washington, Simmons Gym, and Rowan Nursing

Closes 11/12/2026Opened 10/9/2026

State of Michigan·Michigan

63% match

171/23125.CTS; Jerome Hart Building - Chilled Water Upgrades

Closes 11/11/2026Opened 10/23/2026

Virginia Community College System - System Office·Virginia

63% match

ATC Replace Chilled Water Central Plant at Tidewater Community College, Virginia Beach Campus, PC#260-B4260-112-c (M26TC127)

Closes 11/19/2026Opened 10/6/2026

Massachusetts Town of Kingston·Massachusetts

63% match

Water Meter and Advanced Metering Analytics Maintenance

Closes 11/4/2026Opened 10/15/2026

Trident Technical College·South Carolina

62% match

TTC - Palmer Campus Chiller Replacement **REVISION 2**

Closes 11/5/2026Opened 10/16/2026

State University of New York (SUNY)·New York

62% match

Chiller/Boiler Upgrades Johnson City Center - Electrical

Closes 11/12/2026Opened 10/21/2026

City of Mandeville·Louisiana

62% match

ITB: LIFT STATION 28, G, & H UPGRADES; C.O.M. PROJECT NO.: 212.25.001

Closes 11/24/2026Opened 10/28/2026

Rapides Parish Sheriff's Office·Louisiana

62% match

Addendum #1 100 TON AIR COOLED CHILLER DC3 CORRECTIONS

Closes 11/12/2026Opened 10/2/2026

Virginia Community College System - System Office·Virginia

62% match

Replace Grayson Hall Elevator and Loading Dock at Wytheville Community College, Project Code# 260-B5260-075 (M25WC153)

Closes 11/12/2026Opened 10/12/2026

Clemson University·South Carolina

62% match

Fitness Equipment for Campus Recreation

Closes 11/19/2026Opened 10/23/2026

Columbus State Community College·Ohio

62% match

CSCC WD-1 Annex Major Renovation

Closes 11/10/2026Opened 10/20/2026

City of Piqua·Ohio

62% match

CITY OF PIQUA OHIO - Drake Road Water Booster Pumping Station - Project #24-17.3

Closes 11/19/2026Opened 10/11/2026

Albany State University·Georgia

62% match

Fitness Equipment

Closes 11/4/2026Opened 10/26/2026

Little Blue NRD·Nebraska

62% match

LBNRD Water Meter Replacements

Closes 12/3/2026Opened 10/23/2026

Oregon Health and Science University·Oregon

62% match

Computer Aided Dispatch – Records Management System

Rolling / TBD closeOpened 2/13/2020

City of St. Charles·Illinois

62% match

Advanced Metering Infrastructure (AMI)

Closes 12/3/2026Opened 9/30/2026