The Wayne Community College is seeking bids for the construction of a Master Meter and Booster Pump Addition project. The project includes the addition of a master meter, master back flow preventer, and packaged domestic and fire booster pump system and shelter, as well as an extension of approximately 250 LF of water main, installation of nine 10-inch isolation valves, and connection to existing power. The project is expected to last 180 days. The bid documents can be obtained from the Issuing Office, and a pre-bid conference will be held on November 19, 2025. The bid submission deadline is December 8, 2025.
• The project requires the installation of a master meter, master back flow preventer, and packaged domestic and fire booster pump system and shelter.
• The project includes an extension of approximately 250 LF of water main.
• The project requires the installation of nine 10-inch isolation valves.
• The project requires connection to existing power.
• The project is expected to last 180 days.
• The bid documents can be obtained from the Issuing Office.
• A pre-bid conference will be held on November 19, 2025.
• The bid submission deadline is December 8, 2025.