The Town of Brighton is seeking proposals from qualified contractors to install a new cold-climate heat pump system that will cover the occupied space in the Brighton Town Hall. The existing boiler system will be retained to provide ambient temperature control with the heat pump system serving as the primary heating and only cooling option. Additionally, install remotely accessible, fully programmable thermostats for both the heat pump and existing hot water systems.
* Replace the two existing 170 MBH #2 oil boiler with a 40-ton air cooled heat pump system
* Install a programmable thermostat to better control the equipment’s operating hours
* Install remotely accessible, fully programmable thermostats for both the heat pump and existing hot water systems
* Ensure all work complies with NFPA 70, Vermont State Building and Electrical Codes, and manufacturer specifications
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.