The City of Dayton, Department of Water is seeking proposals from a highly experienced and professional engineering consultant or consulting team to design an expansion of the capacity of the South Miami Well Field. The work shall include the siting and design of four new production wells and a pipe network to connect the new wells to an existing raw water main. Design will also include a new air stripper complex to reduce the level of volatile organic compounds (VOCs) and modifications required to restore the existing Relift Pump Station used to pump the water to the Miami Water Treatment Plant. Key tasks include project management and coordination, design of wells and pipe network, design of air stripper complex and Relift Pump Station, and construction drawings.
• The project requires a highly experienced and professional engineering consultant or consulting team.
• The scope of work includes design of four new production wells and a pipe network.
• The project also includes design of a new air stripper complex and modifications to the existing Relift Pump Station.
• The consultant will be responsible for project management and coordination, including communication with Dayton Water and preparation of monthly invoices.
• The consultant will also be responsible for design of the air stripper complex, including geotechnical evaluation, pretreatment systems, and foulant sampling and bench scale testing.
• The project requires compliance with City of Dayton Construction Standards and Engineering Design Standards, as well as OEPA permit to install criteria.