Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More energy and utilities bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Energy and Utilities
  5. ›TCEP GREEN POWER MICROGRID (EV CHARGERS AND RENEWABLES AT…

California Port of Oakland·California

TCEP GREEN POWER MICROGRID (EV CHARGERS AND RENEWABLES AT HARBOR FACILITIES)

Closes 12/16/2025$5M – $15MInvitation for BidLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Port of Oakland is seeking bids for the installation of a Battery Energy Storage System (BESS), electric vehicle (EV) chargers, and a Microgrid system at their harbor facilities. The project includes site preparation, grading, installation of BESS units, EV chargers, associated switchgear, transformers, underground conduits, vaults, cabling, and necessary interconnections with the existing electrical infrastructure. The work also includes the replacement of the building roof to support the installation of Microgrid infrastructure, as well as preparation, grading, pavement restoration, security fencing, lighting, and any necessary testing and commissioning to ensure the successful operation of the Microgrid and EV charging infrastructure. Key features of the project include: • Installation of a Battery Energy Storage System (BESS) • Installation of electric vehicle (EV) chargers • Implementation of a Microgrid system • Site preparation and grading • Installation of associated electrical infrastructure • Replacement of the building roof • Testing and commissioning of the Microgrid and EV charging infrastructure

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

[email protected]

(510) 627-1439

Key dates

Opened
10/20/2025
Questions due
12/9/2025
Pre-bid meeting
11/4/2025
Site visit
11/4/2025
Closes
12/16/2025
Duration
760 days

Last updated

Details

Type
Invitation for Bid
Industry
Energy and Utilities
NAICS
237130
Solicitation №
2025-07-M2

Budget estimate

$5,000,000 – $15,000,000

Based on the project description, the estimated budget for this project could be in the range of $5 million to $15 million. This estimate is based on the complexity of the project, the scope of work, and the materials and equipment required. The actual budget could be higher or lower, depending on the bids received and the final contract award. Factors that may influence the likely payment range include the cost of materials, labor, and equipment, as well as any potential change orders or modifications to the project scope.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Port of Stockton·California

Top match · 73%

EPA Customer Side Design & Engineering

Closes 11/12/2026Opened 10/8/2026

Port of Stockton·California

70% match

EPA Customer Side Design & Engineering

Closes 11/12/2026Opened 10/8/2026

Port of Long Beach·California

69% match

On-Call Professional Clean Energy and Operational Resiliency Services

Closes 12/3/2026Opened 10/28/2026

U.S. Virgin Islands GVIBUY·U.S. Virgin Islands

69% match

Engineer and Construct a Renewably Powered Battery-Coupled DC Fast Charging Network for the GVI, USV

Closes 11/5/2026Opened 10/7/2026

Public Service Company of New Mexico·New Mexico

69% match

RFI: Transportation Electrification Program (TEP)

Closes 11/6/2026Opened 9/1/2026

U.S. Department Of Defense·California

68% match

U.S. Army 63rd Readiness Division MILCON ERCIP Microgrid

Closes 3/31/2027Opened 3/31/2026

Port of Long Beach·California

68% match

HD-S3203 HARBOR FLEET ZERO EMISSIONS INFRASTRUCTURE

Closes 11/17/2026Opened 10/8/2026

New York State Energy Research and Development Authority·New York

68% match

Clean Energy Financing Arrangements

Closes 12/30/2030Opened 2/28/2025

Northeast Wisconsin Technical College·Wisconsin

67% match

Green Bay Campus Rooftop Solar

Closes 11/3/2026Opened 10/12/2026

Massachusetts Department of Energy Resources·Massachusetts

67% match

DOER PON-ENE-2027-001 LBE Clean Energy Grants for State Entities Fleet EVSE Deployment 4.0

Closes 6/30/2027Opened 8/20/2026

State of Delaware ARNG·Delaware

67% match

Biden Microgrid

Closes 11/10/2026Opened 9/22/2026

LA Port of Long Beach·California

67% match

On-Call Professional Clean Energy and Operational Resiliency Services

Closes 12/3/2026Opened 10/28/2026

California Department of General Services·California

67% match

Request for Qualifications for Solar, Wind, Battery Storage, Microgrids, and other Clean Energy Technologies

Closes 12/23/2026Opened 10/6/2026

New York State Energy Research and Development Authority·New York

67% match

Grid Modernization Grid Enhancing Technologies

Closes 10/7/2029Opened 6/25/2026

Labor, NYS Dept. of·New York

66% match

New York State Department of Labor (NYSDOL) Office of Just Energy Transition (OJET) Growing the Clean Energy Workforce – Electric Vehicles (GCEW-EV) Request for Applications (RFA)

Closes 12/3/2026Opened 4/10/2026

NYSERDA·New York

66% match

Grid Modernization Grid Enhancing Technologies

Closes 11/19/2029Opened 6/26/2026

U.S. National Energy Technology Laboratory·United States of America

66% match

Grid Supply Chain Alternatives to Lead Energy Dominance (SCALED)

Closes 2/8/2027Opened 10/30/2026

Connecticut Department of Economic and Community Development·Connecticut

66% match

Energy Assistance

Rolling / TBD closeOpened 12/6/2024

Power Authority of New York·New York

66% match

Albany GSD Landfill Solar PV Project EPC Services

Closes 11/17/2026Opened 10/2/2026

City of Hartford·Connecticut

66% match

On Call Electric Vehicle (EV) Consultant Services

Closes 11/19/2026Opened 10/26/2026

Massachusetts Department of Transportation·Massachusetts

66% match

613689 CAMBRIDGE FAP No. HPP/STP-003E(014)X Neighborhood Electric Vehicle Charging Infrastructure

Closes 11/10/2026Opened 9/14/2026

U.S. Rural Business-Cooperative Service·United States of America

66% match

Renewable Energy Systems and Energy Efficiency Improvements Program

Rolling / TBD closeOpened 10/13/2015

California Energy Commission·California

66% match

GFO-25-603 - California’s National Electric Vehicle Infrastructure Formula Program – Solicitation 6 Community Charging

Closes 11/20/2026Opened 2/23/2026

Massachusetts Department of Energy Resources·Massachusetts

66% match

LBE Solar-Decarbonization Grant Program for State Entities

Closes 6/29/2028Opened 9/20/2024

Connecticut Energy & Environmental Protection·Connecticut

65% match

Electric Vehicle Charging Station Upgrades

Closes 11/13/2026Opened 10/23/2026