The U.S. Army Corps of Engineers is seeking information about utility tractors for the Lake Washington Ship Canal. The tractor must meet specific requirements, including an open station seating, gross vehicle capacity of 2,300 lbs, power steering, and compatibility with various attachments. The contractor must provide descriptive materials, operation and maintenance manuals, and a 1-year warranty. The successful bidder will be required to deliver the tractor to the Hiram M. Chittenden Locks in Seattle, Washington by July 1st, 2026.
• The tractor must have a front loader bucket attachment and be compatible with miscellaneous attachments.
• The tractor must have a rear tire spacer and filled with ballast.
• The engine must have a SAE J1995 rated power of 28-35 kW and a turbocharged aspiration.
• The tractor must have a hydrostatic power steering and wet disk brakes.
• The contractor must provide two complete copies of the operation and maintenance manual.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.