The City of New York is seeking a qualified contractor to replace the rooftop chiller at the historic New York City Center, including demolition of existing equipment, installation of a new modular chiller, new air‑handling units, louvers, structural, electrical, plumbing, fire‑alarm and asbestos‑abatement work, and related commissioning. The scope encompasses full labor and material procurement, temporary climate control for rehearsal studios, and compliance with NYC building, energy, fire, and historic‑preservation codes. The bid will be submitted through PASSPort with a deadline of September 24 2026, and a pre‑bid site visit is scheduled for August 24 2026 (optional). The contract is expected to run from May 17 2027 to June 20 2028, roughly a 13‑month period.
• Replace existing 60‑ton rooftop air‑cooled chiller and associated HVAC equipment.
• Perform demolition, structural steel and masonry modifications, new louvers, fire‑rated assemblies, and full MEP integration.
• Provide temporary heating/cooling for three rehearsal studios and conduct full commissioning (MEP, fire‑alarm, building‑enclosure).
• Must comply with NYC Building Code, Energy Conservation Code, Fire Code, asbestos regulations, and historic‑treatment requirements.
• Bids submitted electronically via PASSPort; bid security required; bid opening on September 24 2026 at 2:30 pm.