Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • How to answer an RFIRFI Meaning: What Is an RFI?
More environmental services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›RELIEF WELL PUMPING AT THE CHENA LAKES FLOOD CONTROL PROJECT

U.S. Department Of Defense·Alaska

RELIEF WELL PUMPING AT THE CHENA LAKES FLOOD CONTROL PROJECT

Closes 12/4/2025$500k – $2MRequest for Information
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The U.S. Army Corps of Engineers, Alaska District, is conducting market research to determine the acquisition strategy for the Relief Well Pumping at the Chena Lakes Flood Control Project. The project involves providing all management, labor, equipment, travel, supplies, and materials to perform relief well pumping on up to 174 relief wells at the Chena River Lakes Flood Control Project, located approximately 18 miles east of Fairbanks, Alaska. The contractor must prepare and submit a Draft Work Plan, including a Quality Control Plan, Testing, Maintenance, and Monitoring Plan, and an Accident Prevention Plan. The contractor must also perform a step-drawdown test on all cleaned wells to determine their efficiency after cleaning. Some key points to consider: • The project requires the use of a submersible pump, motor, VFD, associated pipe, and pump assembly accessories to meet specific specifications. • The contractor must provide a pump curve demonstrating the capability to deliver a minimum flow rate of 350 GPM at a head equivalent to the anticipated drawdown in the wells. • The contractor must use a water level data logger and water level tape to track and monitor water levels during pumping tests. • The contractor must use an electronic flow meter to measure the flow rate and a Rossum Sand Tester to determine the amount of sand in the effluent.

Attached files

Contact

Travis Tofi(Primary Contact)

[email protected]

(907) 753-2714

Key dates

Opened
11/5/2025
Closes
12/4/2025
Projected award
4/1/2026

Last updated

Details

Type
Request for Information
Industry
Environmental Services
NAICS
541380
Solicitation №
PANPOD26P0000026634

Budget estimate

$500,000 – $2,000,000

The budget for this contract is not explicitly stated, but based on the scope of work and the equipment required, it is likely to be a significant amount. The contract involves the use of specialized equipment, such as submersible pumps and water level data loggers, and requires a high level of expertise in well testing and maintenance. Considering the project's location and the number of relief wells involved, the budget could be in the range of $500,000 to $2 million. Factors that may influence the likely payment range include the complexity of the work, the duration of the contract, and the level of competition among bidders.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·Louisiana

Top match · 68%

Flood Control, Amite River Tributaries, Louisiana, Comite River Basin, Comite River Diversion Project, Bayou Baton Rouge Rock Chute, East Baton Rouge Parish, Louisiana

Closes 2/6/2027Opened 11/5/2024

U.S. Department Of Agriculture·Utah

68% match

Yellow Lake Disaster Relief Project – Watershed / Uinta-Wasatch-Cache NF

Closes 11/9/2026Opened 10/30/2026

U.S. Department of Homeland Security - FEMA·United States of America

67% match

Fiscal Year 2024 Flood Mitigation Assistance

Rolling / TBD closeOpened 1/6/2025

Gwinnett County Government·Georgia

67% match

Tribble Mill Dam No. 2 (Chandler Lake) Rehabilitation

Closes 12/9/2026Opened 10/21/2026

City of Coronado·California

67% match

First Street Stormwater Pump Station Flood Relief Project

Closes 11/9/2026Opened 9/23/2026

City of Charlotte·North Carolina

66% match

Gleneagles Storm Drainage Improvement Project

Rolling / TBD closeOpened 3/23/2026

County of Ontario·New York

66% match

Geneva Drinking Water Plant Floodplain Restoration Project Feasibility Study

Closes 12/15/2026Opened 10/15/2026

U.S. DOC NOAA - ERA Production·United States of America

66% match

NOAA Great Lakes Fish Habitat Restoration Partnership Grants

Rolling / TBD closeOpened 8/27/2024

U.S. Department Of Defense·Kentucky

66% match

Fishtrap Lake Intake Structure and Dam Rehabilitation; W91237-26-R-A020

Closes 11/6/2026Opened 10/9/2026

Chittenden County Regional Planning Commission·Vermont

65% match

Ongoing Call: RFQ TO MUNICIPALITIES & ORGANIZATIONS TO SERVE AS WATER QUALITY IMPROV

Closes 12/31/2026Opened 7/18/2022

California Grants·California

65% match

Dam Safety and Climate Resilience Local Assistance

Rolling / TBD closeOpened 5/19/2026

U.S. Department Of Defense·California

65% match

Coyote Valley Dam (CVD) Lake Mendocino Sewage and Septic Services

Closes 11/9/2026Opened 10/28/2026

Dickenson County·Virginia

65% match

Dickenson County Public Service Authority Haysi Wastewater Treatment Plant

Closes 11/16/2026Opened 9/30/2026

City of Lake Charles·Louisiana

65% match

CITY OF LAKE CHARLES, LOUISIANA HAZARD MITIGATION GRANT PROGRAM (HMGP) LIFT STATION BACK‑UP POWER IMPROVEMENTS

Closes 11/17/2026Opened 10/22/2026

NYS Ontario County·New York

65% match

Geneva Drinking Water Plant Floodplain Restoration Project Feasibility Study

Closes 12/15/2026Opened 10/16/2026

U.S. Department Of Defense·Missouri

65% match

Corning and Holt 10 Levee Repairs

Closes 7/21/2027Opened 7/21/2026

U.S. Department of Homeland Security - FEMA·United States of America

65% match

Fiscal Year 2026 Flood Mitigation Assistance

Closes 2/26/2027Opened 10/22/2026

City of Hilliard, Ohio·Ohio

65% match

Heritage Lakes No 1 Lift Station Replacement (CIP S-48)

Closes 11/19/2026Opened 10/29/2026

Wi Dept of Transportation·Wisconsin

65% match

Septic Pit Pumping Services

Closes 11/2/2026Opened 10/9/2026

City of Fresno·California

65% match

Wellhead Treatment Improvements at Pump Station 102A

Closes 11/17/2026Opened 10/20/2026

California Grants·California

65% match

Flood Partnership: Real-time Data Grant Program

Rolling / TBD closeOpened 8/21/2026

U.S. Department Of Agriculture·Minnesota

65% match

Septic Toilet Pumping for Chippewa National Forest

Closes 11/4/2026Opened 10/20/2026

U.S. Bureau of Reclamation·United States of America

65% match

WaterSMART Drought Response Program

Closes 10/2/2031Opened 3/5/2026

City of Seattle·Washington

65% match

Outreach Event: Cascades Dam Tour

Closes 2/26/2027Opened 9/30/2026

Gwinnett County Government·Georgia

65% match

Bypass Pumping Services on an Annual Contract

Closes 11/6/2026Opened 9/30/2026