Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›Removal of Water Well Annex 26 (EO-3744)

Long Beach Utilities Department·California

Removal of Water Well Annex 26 (EO-3744)

Closes 2/3/2026$500k – $700kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Long Beach - Long Beach Utilities Department is seeking bids for the removal of Water Well Annex 26. The project involves the demolition and removal of existing facilities, including electrical equipment, conduit, air vac assembly, and vent. The contractor will also be responsible for abandoning existing underground vaults and stairs, abandoning existing pipe, and backfilling the well with sand-cement slurry. The project is estimated to take 90 calendar days to complete, and the engineer's estimate is $573,751. The bid submission deadline is January 28, 2026, at 2:00 pm. • The project requires the contractor to protect existing facilities, including 20" distribution main, 30" collection main, existing irrigation systems, trees, vegetation, and concrete paving and curbs. • The contractor must demolish, remove, and dispose of electrical equipment, conduit, air vac assembly, and vent. • The contractor must abandon 3,000-gallon underground pressure tank in place and fill with 1-sack slurry. • The contractor must abandon existing underground vault and stairs in place. • The contractor must abandon existing blowoff lateral in place and salvage blowoff assembly. • The contractor must abandon in place and remove valves as shown on plans and salvage cast iron sleeve and lid. • The contractor must abandon existing pipe in place and cap and fill pipe with 1-sack slurry. • The contractor must backfill well with sand-cement slurry and install mushroom cap.

Attached files

Contact

Nikolas Baykal(Purchaser)

(562) 570-2347

Key dates

Opened
12/26/2025
Questions due
1/21/2026
Pre-bid meeting
1/14/2026
Closes
2/3/2026
Duration
90 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237110
Solicitation №
UD-26-303

Budget estimate

$500,000 – $700,000

Based on the engineer's estimate, the budget for this project is likely to be around $573,751. However, this amount may vary depending on the actual bid prices and the complexity of the work involved. The budget may be influenced by factors such as the cost of labor, materials, and equipment, as well as any potential change orders or unforeseen site conditions.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Salina·Kansas

Top match · 69%

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 8/3/2026

City of Salina·Kansas

69% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 7/31/2026

Pennsylvania Department of Environmental Protection·Pennsylvania

69% match

Cleaning Out and Plugging Twenty‑Five (25) Orphan Gas Wells – OOGM 26‑2

Closes 12/3/2026Opened 10/16/2026

City of Salina·Kansas

69% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 7/31/2026

U.S. Department Of Defense·United States of America

69% match

Arcadia Wet Well Rehabilitation

Closes 11/9/2026Opened 10/8/2026

Bossier Parish Police Jury·Louisiana

68% match

Goodwill Road at Highway 80 – Well #29 (Well #23 Replacement) – Consolidated Waterworks/Sewerage District No. 1

Closes 11/5/2026Opened 10/7/2026

City of Salina·Kansas

68% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 8/6/2026

City of Meriden·Connecticut

68% match

RFP027-35 Evansville East Well Rehabilitation

Closes 11/20/2026Opened 10/30/2026

City of Meriden·Connecticut

67% match

RFP027-34 Platt & Lincoln Well Rehabilitation

Closes 11/20/2026Opened 10/30/2026

City of Hollywood·Florida

67% match

Water Treatment Plant Maintenance Package 'B'; Project No. 25-4262

Closes 12/3/2026Opened 10/26/2026

City of Salina·Kansas

67% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 8/7/2026

Nevada Department of Human Services·Nevada

67% match

Water Well Repair

Closes 11/3/2026Opened 10/20/2026

City of Salina·Kansas

67% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 8/5/2026

U.S. Department Of The Interior·Hawaii

67% match

Y--HAVO 326181 Rehabilitate Rainshed&Water Treatment

Closes 11/6/2026Opened 10/13/2026

Hastings Utilities·Nebraska

67% match

Water/Sanitary Sewer Relocation HU 2026-69

Rolling / TBD closeOpened 6/30/2026

Pennsylvania Department of Environmental Protection·Pennsylvania

67% match

C&P 25 OG Wells, Wetmore Twp., McKean Cnty.

Closes 12/3/2026Opened 10/16/2026

Irvine Ranch Water District·California

67% match

Wells 6, 12, 14, and 15 Site Improvements

Closes 11/18/2026Opened 10/15/2026

Harris County·Georgia

66% match

US Hwy 27 Water Main Relocation

Closes 1/18/2027Opened 12/9/2022

City of Riverside·California

66% match

WATER WELL REHABILITATION PROGRAM FY2026/2027

Closes 11/20/2026Opened 10/23/2026

Connecticut City of Meriden·Connecticut

66% match

Evansville Well Rehabilitation

Closes 11/20/2026Opened 10/30/2026

City of Rockford·Illinois

66% match

WELL 6 RESERVOIR REHAB

Closes 11/10/2026Opened 10/13/2026

California Department of Veterans Affairs·California

66% match

26YS0058 - Supplemental Water Treatment Operator Labor Services

Closes 11/5/2026Opened 10/23/2026

City of Meriden·Connecticut

66% match

RFP027-33 Mule Well Rehabilitation

Closes 11/20/2026Opened 10/29/2026

Massachusetts Town of Pembroke·Massachusetts

66% match

Pembroke Well 4R Implementation

Closes 11/18/2026Opened 10/27/2026

Town of Dumfries·Virginia

66% match

IFB # 27-003 - UTILITY ABANDONMENT AND SITE RESTORATION AT 3800 GRAHAM PARK ROAD

Closes 11/5/2026Opened 10/15/2026