The Brunswick‑Glynn County Joint Water & Sewer Commission (BGJWSC) is seeking a qualified design‑builder to deliver progressive design‑build services for a new North Mainland Water Pollution Control Facility (WPCF) in Glynn County, GA. The contractor will be responsible for planning, evaluating, designing, constructing, commissioning, and starting up a full‑scale wastewater treatment plant, including off‑site effluent discharge piping, approximately 2,000 ft of gravity sewer extensions, and connections to existing force mains. The project must accommodate future expansion to meet growing residential and industrial demand, and must comply with all applicable water quality and regulatory standards. Submissions are accepted electronically through the BGJWSC procurement portal, with a mandatory pre‑bid (offerors’) conference on 14 Oct 2026. The contract will be awarded to the proposer offering the best value under a progressive design‑build delivery method.
• Scope includes complete design, civil/structural, mechanical, electrical, and control systems for a new wastewater treatment plant.
• Required deliverables: detailed engineering, construction of the plant and associated pipelines, commissioning, and startup.
• Must incorporate provisions for future capacity expansions.
• Location: near Exit 42 on I‑95, Glynn County, GA (Brunswick address 1703 Gloucester St, Brunswick, GA 31520).
• Mandatory pre‑bid teleconference on 14 Oct 2026 10:00 AM; proposals due 29 Oct 2026 12:00 PM EST.
• Procurement type: progressive design‑build (RFP).