Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Delaware guideDelaware Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Delaware
  4. ›Construction
  5. ›National Electric Vehicle Infrastructure (NEVI) Round 2

State of Delaware DOT·Delaware

National Electric Vehicle Infrastructure (NEVI) Round 2

Closes 8/18/2026$500k – $2MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Delaware Department of Transportation (DelDOT) is issuing a competitive RFP to design, procure, install, operate, and maintain public electric‑vehicle (EV) charging infrastructure under the federal NEVI Formula Program (Round 2). Vendors must deliver Level 2 AC and/or DC‑Fast‑Charging stations that meet a minimum 600 kW capacity per site, ensure 24/7 public access, satisfy ADA and safety requirements, and provide a five‑year operations and maintenance plan with ≥97 % uptime. The contract is for an initial six‑year term with possible one‑year extensions and includes performance‑bond, bid‑bond, and insurance obligations. Funding is capped at $8 million for this round, with an 80 % federal cost‑share and a required 20 % non‑federal match. Proposals must be submitted electronically via the Bonfire portal by August 4 2026. • Deliver design, permitting, construction, and commissioning of EV‑charging stations (both Level 2 and DCFC). • Provide O&M services for at least five years, meeting 97 % uptime and detailed reporting requirements. • Meet technical standards: ≥4 × 150 kW DCFC ports per site, include at least one SAE CCS connector (CHAdeMO not required). • Comply with extensive insurance, bonding, and data‑security requirements, and submit detailed cost breakdowns using the provided budget template.

Attached files

Contact

Crystal Crump(Contract Administration)

[email protected]

(302) 760-2031

Key dates

Opened
6/24/2026
Questions due
7/21/2026
Closes
8/18/2026
Duration
6 years

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
238210
Solicitation №
DOT2606-NEVI_2

Budget estimate

$500,000 – $2,000,000

The NEVI round‑2 allocation for Delaware is $8 million, but individual award sizes will vary based on site count and scope. Typical multi‑site EV‑charging projects range from $0.5 M to $2 M per vendor, covering equipment, installation, and the first‑year O&M. Therefore a reasonable earning estimate for a successful bidder is between $500,000 and $2,000,000, depending on the number of sites and the depth of O&M services provided.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Wyoming Department of Transportation·Wyoming

Top match · 73%

NATIONAL ELECTRIC VEHICLE INFASTRUCTURE PROGRAM

Closes 11/18/2026Opened 9/23/2026

Public Service Company of New Mexico·New Mexico

70% match

RFI: Transportation Electrification Program (TEP)

Closes 11/6/2026Opened 9/1/2026

NYS Rockland County·New York

66% match

ELECTRIC VEHICLE CHARGING INFRASTRUCTURE STUDY

Closes 11/6/2026Opened 9/22/2026

California Energy Commission·California

65% match

GFO-25-603 - California’s National Electric Vehicle Infrastructure Formula Program – Solicitation 6 Community Charging

Closes 11/20/2026Opened 2/23/2026

U.S. Virgin Islands GVIBUY·U.S. Virgin Islands

65% match

Engineer and Construct a Renewably Powered Battery-Coupled DC Fast Charging Network for the GVI, USV

Closes 11/5/2026Opened 10/7/2026

Massachusetts Department of Transportation·Massachusetts

64% match

613689 CAMBRIDGE FAP No. HPP/STP-003E(014)X Neighborhood Electric Vehicle Charging Infrastructure

Closes 11/10/2026Opened 9/14/2026

New York City Department of Transportation·New York

64% match

Request for Information (RFI) Regarding Electric Vehicle Charging Incentive Program

Closes 11/30/2026Opened 9/14/2026

NYSERDA·New York

64% match

Grid Modernization Utility Challenge – National Grid

Closes 11/10/2026Opened 10/8/2026

Washington Commerce, Dept. of·Washington

64% match

Washington ­­­­­­­­­­­­­­­­Electric Vehicle Instant Rebates Round 2

Closes 11/20/2026Opened 10/9/2026

Labor, NYS Dept. of·New York

64% match

New York State Department of Labor (NYSDOL) Office of Just Energy Transition (OJET) Growing the Clean Energy Workforce – Electric Vehicles (GCEW-EV) Request for Applications (RFA)

Closes 12/3/2026Opened 4/10/2026

City of Pinole·California

64% match

Design Services for Electric Vehicle Charging Infrastructure for the City of Pinole

Closes 11/4/2026Opened 10/7/2026

City of Charlotte·North Carolina

63% match

Nevin Rd and W Sugar Creek Rd ITS

Rolling / TBD closeOpened 1/1/2027

Hawaii Department of Accounting and General Services·Hawaii

63% match

BEV Electric Compact Size Sedan

Closes 11/6/2026Opened 10/23/2026

California Energy Commission·California

63% match

GFO-26-301 - Characterizing Non-Driving Electric Vehicle Energy Efficiency

Closes 11/13/2026Opened 2/9/2026

City of Hartford·Connecticut

62% match

On Call Electric Vehicle (EV) Consultant Services

Closes 11/19/2026Opened 10/26/2026

County of Hawaii·Hawaii

62% match

MASS TRANSIT FACILITY IMPROVEMENTS

Closes 11/5/2026Opened 9/28/2026

New York State Energy Research and Development Authority·New York

62% match

Grid Modernization Utility Challenge – National Grid

Closes 11/10/2026Opened 10/8/2026

Power Authority of New York·New York

62% match

LAN CONNECTIVITY EXPANSION

Closes 11/9/2026Opened 10/19/2026

Massachusetts Department of Energy Resources·Massachusetts

62% match

DOER PON-ENE-2027-001 LBE Clean Energy Grants for State Entities Fleet EVSE Deployment 4.0

Closes 6/30/2027Opened 8/20/2026

Agency of Natural Resources (ANR), Department of Environmental Conservation (DEC)·Vermont

62% match

2026 Volkswagen Environmental Mitigation Trust: Eligible Mitigation Actions

Closes 12/31/2026Opened 6/25/2026

Illinois Environmental Protection Agency·Illinois

62% match

Driving a Cleaner Illinois - Diesel Emissions Reduction Act (DERA)

Closes 1/31/2028Opened 10/28/2026