The Western Area Power Administration is seeking a contractor to provide all the labor, materials, tools, equipment, transportation, and other resources necessary to complete the Installation of Dedicated 120VAC and 240VAC Receptacles for Data Center Re-cabling Project. The work includes furnishing and installing a code-compliant underfloor gutter system capable of distributing both 120 VAC and 240 VAC branch circuits from designated electrical panels to strategically located receptacles serving the new SCADA equipment racks, workstations, and supporting devices. The contractor shall provide all labor, materials, equipment, supervision, testing, permits (if required), and documentation necessary to install dedicated electrical receptacles and circuits within the WAPA Data Center.
• The contractor shall provide eight 240VAC, 20-amp receptacles and eight 120VAC, 20-amp receptacles.
• Each receptacle shall be supplied by an individual dedicated 20-amp circuit breaker.
• The contractor shall perform all work in accordance with the latest edition of the National Electrical Code (NEC) and all applicable federal, state, and local requirements.
• The contractor shall furnish and install an approved electrical gutter/raceway system beneath the raised data center subfloor for routing all conductors associated with the new 120VAC and 240VAC receptacles.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.