The Northwest Arctic Borough (NAB) is soliciting a firm‑fixed‑price EPC contractor to design, procure, install, and commission a 703 kW DC ground‑mounted solar PV array and a ≥ 1 MW / ≥ 1 MWh battery energy storage system (BESS) in Selawik, Alaska. The contractor will also demolish existing wind‑turbine electrical components, install an 8‑ft perimeter fence, provide all required communications, HVAC, and a micro‑grid controller that integrates with AVEC’s ComAp Intelineo 6000 system, and deliver training, O&M manuals, and a one‑year workmanship warranty. All work must comply with Build America, Buy America (BABA) and Davis‑Bacon prevailing‑wage requirements, and be completed by 31 Dec 2026.
• Engineering, design (PE‑signed) and construction of solar racking, foundations, and module installation (modules already on‑site).
• Full supply, installation, testing (FAT & SAT) and integration of a grid‑forming BESS with inverter, BMS, HVAC, fire‑safety, and micro‑grid controller.
• Permitting, communications infrastructure, perimeter fencing, commissioning, training, O&M manual, spare‑parts kit, and a 1‑year warranty.