The Town of Brighton is seeking proposals from qualified contractors to install a new cold-climate heat pump system that will cover the occupied space in the Brighton Railroad Depot Building. The existing boiler system will be retained to provide ambient temperature control with the heat pump system serving as the primary heating and only cooling option. The project includes installing remotely accessible, fully programmable thermostats for the heat pump system. The scope of work includes providing and installing a cold-climate, ENERGY STAR rated air-source heat pump system, replacing/installing smart thermostats, and ensuring all work complies with NFPA 70, Vermont State Building and Electrical Codes, and manufacturer specifications.
• The Brighton Railroad Depot Building is a two-story building with approximately 7,000 square feet.
• The building has a stone and mortar foundation, brick masonry superstructure, and a wooden roof.
• The building is currently heated by a fuel oil fired boiler and cooled by a TRANE air handling unit.
• The project aims to reduce energy consumption, extend equipment life, and improve occupant comfort.
• The town is looking for a contractor with experience in installing cold-climate heat pumps and familiarity with Efficiency Vermont incentives.
• The project is expected to start in the spring/summer of 2026 and be completed by September 30, 2026.