The Edinburg Consolidated Independent School District (ECISD) is seeking a qualified contractor to replace the existing chiller system at Avila Elementary School. The work is to be performed on a lump‑sum basis, must comply with all construction documents, and includes complete removal of the existing equipment, installation of a new chiller, associated piping, electrical, and controls, testing, commissioning, and warranty provisions. Bidders must submit a sealed proposal, a 5 % bid bond, and cannot withdraw their bid for 60 days after submission. A pre‑bid conference is scheduled for 9/29/2026, and site inspections are encouraged. The project is expected to be substantially completed by July 30 2027.
• Scope: complete removal of existing chiller, supply and install new chiller system, associated mechanical, electrical, and control work.
• Contract type: Competitive sealed proposal (lump‑sum).
• Mandatory bid bond: 5 % of the highest possible proposal amount.
• Pre‑bid conference: 09/29/2026, 9:00 AM at ECISD Facilities Dept., Edinburg, TX.
• Question deadline: 10/02/2026 5:00 PM CT.
• Proposal deadline: 10/07/2026 3:00 PM CT.
• Required submissions: original, copy, and digital (USB) proposal; bid bond; required forms (W‑9, insurance, CIQ, etc.).
• Project timeline: start after award, work to commence within 10 days of notice to proceed, substantial completion targeted for 07/30/2027.