Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Texas guideTexas Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Texas
  4. ›Construction
  5. ›AVILA ELEMENTARY CHILLER REPLACEMENT

Edinburg ISD·Texas

AVILA ELEMENTARY CHILLER REPLACEMENT

Closes 10/7/2026$500k – $1.5MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Edinburg Consolidated Independent School District (ECISD) is seeking a qualified contractor to replace the existing chiller system at Avila Elementary School. The work is to be performed on a lump‑sum basis, must comply with all construction documents, and includes complete removal of the existing equipment, installation of a new chiller, associated piping, electrical, and controls, testing, commissioning, and warranty provisions. Bidders must submit a sealed proposal, a 5 % bid bond, and cannot withdraw their bid for 60 days after submission. A pre‑bid conference is scheduled for 9/29/2026, and site inspections are encouraged. The project is expected to be substantially completed by July 30 2027. • Scope: complete removal of existing chiller, supply and install new chiller system, associated mechanical, electrical, and control work. • Contract type: Competitive sealed proposal (lump‑sum). • Mandatory bid bond: 5 % of the highest possible proposal amount. • Pre‑bid conference: 09/29/2026, 9:00 AM at ECISD Facilities Dept., Edinburg, TX. • Question deadline: 10/02/2026 5:00 PM CT. • Proposal deadline: 10/07/2026 3:00 PM CT. • Required submissions: original, copy, and digital (USB) proposal; bid bond; required forms (W‑9, insurance, CIQ, etc.). • Project timeline: start after award, work to commence within 10 days of notice to proceed, substantial completion targeted for 07/30/2027.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

ClauDina E. Longoria(Senior Buyer)

[email protected]

(956) 289-2311

Key dates

Opened
9/19/2026
Questions due
10/2/2026
Pre-bid meeting
9/29/2026
Closes
10/7/2026
Duration
10 months

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
238220
Solicitation №
27-02

Budget estimate

$500,000 – $1,500,000

Based on typical chiller replacement costs for a K‑12 elementary school (capacity roughly 500–800 ton), the equipment and installation can range from $500,000 to $1,500,000, depending on brand, efficiency, site conditions, and ancillary work (duct modifications, electrical upgrades, permitting). The bid bond (5 % of the highest proposal) suggests the owner anticipates a top‑end proposal near $1 M. Therefore, a realistic earnings window for the contractor is roughly $500 k–$1.5 M, with the lower end reflecting a standard commercial chiller and the higher end covering a high‑efficiency, premium system plus extensive site work.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Rock Hill School District 3·South Carolina

Top match · 72%

Mt. Gallant Chiller Replacement

Closes 11/19/2026Opened 10/20/2026

NYS OGS Design & Construction - Construction Contractors·New York

71% match

Replace Chiller System, Knight Hall & Dorms

Closes 12/9/2026Opened 10/27/2026

NYS OGS Design & Construction - Construction Contractors·New York

69% match

47690 HVAC – Replace Chiller System, Knight Hall & Dorms

Closes 12/9/2026Opened 10/27/2026

University of Missouri-Kansas City·Missouri

69% match

Dental School Chiller Replacement (KC664601)

Closes 11/12/2026Opened 10/29/2026

University of South Carolina·South Carolina

68% match

Chiller and Infrastructure Replacement-North Energy Plant Chiller#2

Closes 11/4/2026Opened 10/5/2026

NYS OGS Design & Construction - Construction Contractors·New York

68% match

47690 ELECTRICAL – Replace Chiller System, Knight Hall & Dorms

Closes 12/9/2026Opened 10/27/2026

County of Sacramento·California

67% match

Chiller Overhaul Maintenance Services

Closes 11/4/2026Opened 10/19/2026

U.S. Department Of Veterans Affairs·Texas

67% match

CON | Z2DA | REPLACE CHILLER 1 B104 | 580-24-111 | SOLICITATION

Closes 12/8/2026Opened 10/30/2026

Maryland Howard County Public Schools·Maryland

67% match

054.27.B3 Harper’s Choice Middle School Chiller & Cooling Tower Replacement

Closes 12/3/2026Opened 10/29/2026

Town of Arlington·Massachusetts

67% match

14-02 Peirce School Chiller Project

Rolling / TBD closeOpened 1/30/2014

Kentucky Cabinet for Health and Family Services·Kentucky

66% match

RFB-100-27 CHFS OAK Repair Building 501 Chiller

Closes 11/10/2026Opened 10/13/2026

Trident Technical College·South Carolina

66% match

TTC - Palmer Campus Chiller Replacement *REVISED ATTACHED DOCUMENT**

Closes 11/5/2026Opened 10/13/2026

Lynwood Unified School District·California

66% match

Abbott Elementary School HVAC Unit Replacement

Closes 11/4/2026Opened 10/1/2026

Trident Technical College·South Carolina

66% match

TTC - Palmer Campus Chiller Replacement **REVISION 2**

Closes 11/5/2026Opened 10/16/2026

UCLA Capital Programs·California

65% match

Cogeneration Plant New Electric Chiller (PREQUALIFICATION)

Closes 11/5/2026Opened 10/21/2026

Washington Enterprise Services (DES), Dept. of·Washington

65% match

Wenatchee Valley College- Batjer Chiller Replacement

Closes 11/17/2026Opened 10/23/2026

City of Albany·Georgia

65% match

DOCO Jail HVAC Rebuild & Cooling Tower Installation

Closes 11/13/2026Opened 10/15/2026

The Ohio State University·Ohio

65% match

OSU-265784, Ross Heart Hospital - Low Temperature Chiller Replacement

Closes 11/18/2026Opened 10/28/2026

University of South Carolina·South Carolina

65% match

Chiller and Infrastructure Replacement- North E #2

Closes 11/4/2026Opened 9/26/2026

University of Massachusetts·Massachusetts

65% match

Efficiency Review of Chiller Plants Operation & Maintenance

Closes 11/13/2026Opened 10/16/2026

Virginia Department of Transportation·Virginia

64% match

161109 VDOT Lynchburg Admin Building Chiller Rep

Closes 11/23/2026Opened 10/23/2026

U.S. Department Of Veterans Affairs·Texas

64% match

CON | Z1DA | REPLACE OR CHILLERS | 580-23-105 | SOLICITATION

Closes 12/2/2026Opened 10/29/2026

Alabama United States Air Force·Alabama

64% match

McQuay Chiller Repair for 187th FW BLDG 1501

Closes 11/16/2026Opened 10/29/2026

Lynwood Unified School District·California

64% match

Abbott Elementary School HVAC Units Replacement Project (Bid No. 03MOT27)

Closes 11/4/2026Opened 10/1/2026

University of Wyoming·Wyoming

64% match

WSVL Air Handler & Chiller Replacement

Closes 12/3/2026Opened 10/12/2026