Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Massachusetts guideMassachusetts Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Massachusetts
  4. ›Construction
  5. ›L1918 TRADE CONTRACTOR RFQ – Air Traffic Control Tower…

Massachusetts Port Authority - Capital Programs·Massachusetts

L1918 TRADE CONTRACTOR RFQ – Air Traffic Control Tower Phase 2A (Logan International Airport)

Closes 6/11/2026$2M – $5.9MRequest for QualificationLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

This solicitation seeks qualified trade contractors to perform specific scopes of work on the Air Traffic Control Tower Phase 2A renovation at Logan International Airport. The work is divided into eleven trade categories, each with a defined estimated value, and will be executed under a construction‑manager‑at‑risk contract. Contractors must submit qualification statements (including bonding, DCAMM certification, and detailed schedules) by the deadline; only pre‑qualified firms will receive an Invitation to Bid. The overall project is valued at approximately $7.27 million, with the trade‑contractor portion totaling about $5.9 million, and an estimated construction duration of 14 months. • Trade categories include Masonry, Miscellaneous Metals, Roofing, Tile, Acoustical Tile, Resilient Floors, Painting, Fire‑Protection, Plumbing, HVAC, and Electrical (total estimated value $5.9 M). • Qualification requirements: bonding (110 % of trade value), DCAMM Certificate of Eligibility, detailed Schedule A‑K submissions, and compliance with MGL 149A statutes. • Key dates: supplemental package posted May 13 2026; questions due May 27 2026; qualification submittal due June 11 2026 (12 PM).

Attached files

Contact

Luciana Burdi(Chief Infrastructure Officer)

CPBidQuestions@massport.com

(617) 568-5950

Key dates

Opened
5/13/2026
Questions due
5/27/2026
Closes
6/11/2026
Duration
14 months

Last updated

Details

Type
Request for Qualification
Industry
Construction
NAICS
236220
Solicitation №
L1918 TRADE CONTRACTOR RFQ (Solicitation #47188)

Budget estimate

$2,000,000 – $5,900,000

The solicitation indicates a total trade‑contractor estimate of $5,903,669. Assuming a qualified contractor wins one or more of the trade packages, the potential revenue could range from a single low‑value trade (≈ $25 k) up to the full suite of trades (≈ $5.9 M). Realistically, a firm that can execute multiple trades would likely earn between $2 M and $5 M, depending on the number of scopes won, subcontracting arrangements, and profit margins.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Town of Leesburg·Virginia

Top match · 77%

RFQ No 320830-FY27-15 Pre-Qualification for Construction - Leesburg Executive Airport Air Traffic Control Tower

Closes 11/23/2026Opened 10/26/2026

Massachusetts Port Authority (Massport)·Massachusetts

77% match

Terminal C Redevelopment Logan International Airport

Closes 11/6/2026Opened 10/21/2026

Vantage Group - Boston Logan Terminal C Redevelopment·Massachusetts

76% match

Construction Management at Risk Services for Logan Terminal C Redevelopment

Closes 11/6/2026Opened 10/21/2026

Massachusetts Port Authority - Goods & Services·Massachusetts

74% match

COMMERCIAL ADVERTISING CONCESSION – Boston Logan International Airport & Worcester Regional Airport

Closes 1/28/2027Opened 10/15/2026

Massachusetts Port Authority - Capital Programs·Massachusetts

73% match

L1973 CMAR RFQ – Central Parking Facility Optimization

Closes 11/5/2026Opened 10/7/2026

Town of Leesburg·Virginia

73% match

Pre-Qualification for Construction - Leesburg Executive Airport Air Traffic Control Tower

Closes 11/23/2026Opened 10/26/2026

Massachusetts Port Authority - Goods & Services·Massachusetts

73% match

TAXIWAY LIGHT BASES AND EXTENSIONS AT LOGAN INTERNATIONAL AIRPORT

Closes 11/10/2026Opened 10/27/2026

City of Boise·Idaho

73% match

Boise Airport Vertical Transportation Equipment

Closes 11/4/2026Opened 10/7/2026

U.S. Department Of Transportation·Florida

72% match

MARKET SURVEY NOTICE for new ATCT Project at (FLL) Fort Lauderdale- Hollywood International Airport

Closes 11/5/2026Opened 10/29/2026

City of Boise·Idaho

72% match

2027 Airport Way & Elevated Roadway Construction

Closes 11/12/2026Opened 9/30/2026

U.S. Department Of Defense·Idaho

72% match

Design and construct an Air Traffic Control Tower at Mountain Home Air Force Base ID

Closes 11/12/2026Opened 10/28/2026

City of Charlotte·North Carolina

72% match

Airport Surveillance Radar Relocation Construction

Rolling / TBD closeOpened 5/3/2027

Maryland Aviation Administration·Maryland

71% match

MAA-CO-26-004 Concourse E Ticket Counter Expansion at BWI Thurgood Marshall Airport

Closes 11/18/2026Opened 7/22/2026

Massachusetts Port Authority - Capital Programs·Massachusetts

71% match

A460 RFQ Professional Consultant Services – Digital Building Data Capture

Closes 12/3/2026Opened 10/21/2026

Massachusetts Town of Westborough·Massachusetts

71% match

RFQ General and FSB Contractor for New Dispatch Facility

Closes 11/4/2026Opened 10/23/2026

City of St. Louis·Missouri

71% match

RFQ - Professional Services for Lindbergh Tunnel Inspection and Documentation for Year 2027 at St. Louis Lambert International Airport

Closes 11/12/2026Opened 10/22/2026

Massachusetts Town of Medway·Massachusetts

71% match

Request for Trade Contractor Qualifications for the Medway Municipal Complex Project

Closes 11/10/2026Opened 10/21/2026

Port of Portland·Oregon

71% match

Portland International Airport North Runway Rehabilitation

Closes 11/12/2026Opened 10/15/2026

Massachusetts Port Authority - Goods & Services·Massachusetts

71% match

Prohibited Items Mail Back Concession Program – RFP #1112

Closes 11/12/2026Opened 9/30/2026

U.S. Department Of Defense·Mississippi

70% match

P233 AIR TRAFFIC CONTROL TOWER AND FLIGHT SIMULATOR FACILITY AT KEESLER AIR FORCE BASE, BILOXI, MS

Closes 11/4/2026Opened 10/27/2026

City of Lawrence·Kansas

70% match

On-Call Engineering, Architecture and Construction Services for Airport Development

Closes 11/10/2026Opened 10/19/2026

San Joaquin County·California

70% match

Stockton Metropolitan Airport (SCK) Access Control System Assessment, Upgrade, Consulting, and Maintenance

Closes 12/18/2026Opened 10/30/2026