Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Texas guideTexas Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Texas
  4. ›Construction
  5. ›DCP1 Condenser Water System Replacement

City of Austin·Texas

DCP1 Condenser Water System Replacement

Rolling / TBD close$15M – $25MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Austin is seeking a general contractor to replace the aging cooling towers at its Downtown Cooling Plant #1 (DCP1). The project involves the construction of a 7,200 ton capacity multi-cell stainless steel FM listed cooling tower, packaged condenser water pumps, cooling tower structural steel supports engineering & construction, condenser water piping system and supports, concrete equipment pads, electrical service, cooling tower PLC control system, temporary traffic control system, painting, and miscellaneous work. The project is located at 300 San Antonio Street, Austin, TX, and the contractor will need to ensure that the existing facilities are kept in continuous operation throughout the construction period. The contractor will be responsible for executing all work, including demolition, installing equipment, installing pipe, and miscellaneous concrete, and testing. The project has a mandatory site visit scheduled for May 4, 2026, at 1 pm. Some key points to consider: • The project requires a general contractor with experience in similar projects. • The contractor will need to ensure that the existing facilities are kept in continuous operation throughout the construction period. • The project has a mandatory site visit scheduled for May 4, 2026, at 1 pm. • The contractor will need to provide temporary facilities and make temporary modifications as necessary to keep the existing facilities in operation during the construction period. • The contractor will need to coordinate with the Texas Facilities Commission (TFC) property management team and inform them of project scheduling and progress.

Attached files

Contact

Ming Xu(Project Manager)

[email protected]

(512) 666-4277

Key dates

Opened
4/13/2026
Pre-bid meeting
4/20/2026
Site visit
5/4/2026Mandatory
Closes
Rolling / TBD
Duration
211 days

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
237110
Solicitation №
CSP 6100 CLMB347

Budget estimate

$15,000,000 – $25,000,000

Based on the project description, the estimated budget for this project is between $15,000,000 and $25,000,000. The factors that influence this estimate include the scope of work, the complexity of the project, and the materials and labor required. The project involves the replacement of cooling towers, condenser water pumps, and related systems, which suggests a significant investment in materials and labor. Additionally, the project requires a general contractor with experience in similar projects, which may drive up the cost. However, the City of Austin has estimated the project cost at $20,000,000, which suggests that the actual budget may be closer to this amount.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Veterans Affairs·Delaware

Top match · 65%

Z1DA--Local | 460-26- 4-5074-0108 | 460-26-999 | Condenser Water Piping Modification | (VA-26-00077929)

Closes 11/20/2026Opened 10/21/2026

Metropolitan Council·Minnesota

63% match

St. Paul OMF Water Vacuum System Upgrades

Closes 11/10/2026Opened 10/7/2026

North Carolina Southwestern Community College·North Carolina

62% match

Founders Building Hot Water system rennovation

Closes 11/12/2026Opened 10/21/2026

Bristol Virginia Utilities Authority·Virginia

62% match

CAST IRON WATER LINE REPLACEMENT PROJECT - PHASE 1

Closes 11/5/2026Opened 10/1/2026

Hawaii Department of Defense·Hawaii

62% match

Installation of new replacement backflow preventor assembly, to include all necessary plumbing parts

Closes 11/10/2026Opened 10/14/2026

U.S. Department Of Health And Human Services·Arizona

62% match

SRSU - Water System Installation and Upgrade

Closes 2/17/2029Opened 2/10/2026

Mississippi State University·Mississippi

62% match

Trane Condenser, Evaporator Coil & TXV Replacement

Closes 11/3/2026Opened 10/14/2026

University of Massachusetts System·Massachusetts

62% match

USuites Hot Water Replacement

Closes 11/4/2026Opened 10/21/2026

City of Bellevue·Washington

62% match

2027 Phase 1 Water Main Replacement

Closes 11/12/2026Opened 10/22/2026

U.S. Department Of The Interior·South Dakota

62% match

Z--EROS Removal and replacement of chilled and conden

Closes 11/4/2026Opened 10/14/2026

Virginia Community College System - System Office·Virginia

61% match

ATC Replace Chilled Water Central Plant at Tidewater Community College, Virginia Beach Campus, PC#260-B4260-112-c (M26TC127)

Closes 11/19/2026Opened 10/6/2026

York County·Maine

61% match

HVAC System Upgrade- Courthouse Condenser Units

Closes 11/3/2026Opened 9/28/2026

City of Redlands·California

61% match

2026 CIP Water Pipeline Replacement Project

Closes 11/16/2026Opened 10/29/2026

Oregon DAS On-Behalf Of·Oregon

61% match

VRF Cooling System Replacement

Closes 11/3/2026Opened 10/2/2026

Coastal Carolina University·South Carolina

61% match

Singleton Energy Plant Boiler Replacement

Closes 11/5/2026Opened 10/13/2026

City of Dayton, Ohio·Ohio

61% match

Miami Water Treatment Plant Boiler Replacement

Closes 11/5/2026Opened 10/15/2026

Nevada Adjutant General·Nevada

61% match

OTAG Water Heater Replacement

Closes 11/24/2026Opened 10/23/2026

U.S. Department Of Veterans Affairs·Texas

61% match

Amendment CTX Steam Humidifier

Closes 7/20/2027Opened 7/1/2026

North Dakota State University·North Dakota

61% match

NDSU - ASTM Type I and Type III Pure Water System Replacement

Closes 11/17/2026Opened 10/20/2026

City of Charlotte·North Carolina

61% match

Service Water Improvements and Flow Meter Modifications

Rolling / TBD closeOpened 1/31/2026

City of Hollywood·Florida

61% match

Water Treatment Plant Maintenance Package 'B'; Project No. 25-4262

Closes 12/3/2026Opened 10/26/2026

Pennsylvania PA State Sys of Higher Ed·Pennsylvania

61% match

Mihalik Thompson Stadium DHW Replacement

Closes 11/19/2026Opened 10/21/2026

City of Holly Grove·Arkansas

60% match

Water System Improvements – Waterline Replacement

Closes 11/18/2026Opened 10/25/2026

U.S. Department Of Veterans Affairs·Missouri

60% match

657-27-107JC, Replace Select Hot Water Heating System

Closes 11/3/2026Opened 9/28/2026

U.S. Department Of Veterans Affairs·New York

60% match

Y1DZ--REPLACE CHILLED WATER PUMP AT THE BOILER PLANT

Closes 11/11/2026Opened 10/29/2026