Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›Repair Pier at USCG MSD St Thomas, USVI

U.S. Department Of Homeland Security·Florida

Repair Pier at USCG MSD St Thomas, USVI

Closes 4/1/2026$500k – $2MSole Source
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The United States Coast Guard is conducting market research to identify eligible 8(a) firms capable of providing pier repair services at the USCG Marine Safety Detachment in St. Thomas, USVI. The work includes repairing the pier, replacing damaged wood bridge, installing water utilities, and providing fixtures, materials, and equipment manufactured in the United States. The selected firm will be required to comply with all federal, territory, and local hurricane wind load requirements and provide all necessary permits to complete the work. Some key aspects of the job include: • Repairing the pier and damaged wood bridge • Installing water utilities and dock fenders • Replacing rusted cleats and metal cleats • Repairing damaged concrete pile caps and treating with rust inhibitor • Filling cracks on the pier surface with concrete filler • Replacing the existing damaged wood bridge with a structural plastic lumber bridge • Repairing damage to the approach pier and bulkhead • Installing stone to match the historic stone pattern on the approach pier • Re-grouting between stones on the deck and side wall to match the historic stone pattern

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Karina Gudiel

[email protected]

Key dates

Opened
3/17/2026
Closes
4/1/2026

Last updated

Details

Type
Sole Source
Industry
Construction
NAICS
236220
Solicitation №
PNUM32006425

Budget estimate

$500,000 – $2,000,000

The budget for this project can be estimated based on the scope of work, which includes repairing the pier, replacing the damaged wood bridge, and installing water utilities. The cost of materials, labor, and equipment will contribute to the overall budget. Considering the complexity of the project and the requirements for compliance with federal, territory, and local regulations, the budget could range from $500,000 to $2 million. Factors that may influence the likely payment range include the cost of materials, the number of workers required, and the duration of the project.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Virgin Islands Port Authority·U.S. Virgin Islands

Top match · 70%

STTJ)-2027-03 (Roof Repairs at Ashley Restaurant, St Thomas USVI

Closes 11/20/2026Opened 10/20/2026

City of St. Petersburg·Florida

70% match

St. Petersburg Pier Pile Repairs

Closes 11/5/2026Opened 10/27/2026

U.S. Department Of Homeland Security·Oregon

69% match

USCG STA COOS BAY (47302-47242) FY27 DD REPAIR

Closes 11/12/2026Opened 10/29/2026

U.S. Department Of Defense·United States of America

69% match

USNS CODY (T-EPF 14) MTA

Closes 11/18/2026Opened 10/20/2026

U.S. Department Of Homeland Security·Virginia

69% match

DRYDOCK: USCGC COBIA DRY DOCK AVAILABILITY FY2026

Closes 11/2/2026Opened 10/20/2025

U.S. Department Of Homeland Security·California

69% match

USCGC TERN DRYDOCK REPAIRS

Closes 11/4/2026Opened 10/15/2026

U.S. Department Of Homeland Security·Washington

69% match

Dry-Dock: USCG ANT PUGET SOUND (55107) FY27 DD

Closes 11/5/2026Opened 9/25/2026

U.S. Department Of Homeland Security·Florida

68% match

DOCK-SIDE (DS): CGC RELIANCE DS FY27

Closes 11/6/2026Opened 10/22/2026

U.S. Department Of Homeland Security·Maryland

68% match

Dry-Dock: USCG ANT PUGET SOUND (55107) FY27 DD

Closes 11/5/2026Opened 9/25/2026

U.S. Department Of Homeland Security·Virginia

68% match

USCGC JOSEPH TEZANOS DRYDOCK AVAILABILITY FY2027

Closes 10/12/2027Opened 9/29/2026

U.S. Department Of Homeland Security·Florida

68% match

USCGC HAMMER (WLIC 75302) USCG 68A BARGE (68014) DRYDOCK REPAIRS FY2027

Closes 11/9/2026Opened 10/20/2026

U.S. Department Of Homeland Security·Mississippi

68% match

DRYDOCK REPAIRS FOR THE CGC PATOKA

Closes 11/6/2026Opened 10/23/2026

City of Hermosa Beach·California

67% match

CIP 623 - Pier Structural Repairs Project

Closes 11/12/2026Opened 10/15/2026

U.S. Department Of Homeland Security·Florida

67% match

STA Sand Key Repair Fuel Lines and Tank

Closes 11/13/2026Opened 10/29/2026

U.S. Department Of Homeland Security·Texas

67% match

Drydock Repairs USCGC HATCHET (WLIC-75309)

Closes 11/9/2026Opened 10/7/2026

U.S. Department Of Homeland Security·Puerto Rico

67% match

USCGC JOSEPH TEZANOS DRYDOCK AVAILABILITY FY2027

Closes 10/12/2027Opened 9/29/2026

City of Newport News·Virginia

67% match

Seafood Industrial Park Outer Harbor Pier & Dolphins Restoration

Closes 11/9/2026Opened 10/8/2026

U.S. Department Of Defense·Washington

67% match

Maintenance, Repair, and Preservation of YT-812

Closes 11/3/2026Opened 10/27/2026

U.S. Department Of Homeland Security·Louisiana

67% match

DRYDOCK REPAIRS FOR THE CGC PAMLICO

Closes 11/16/2026Opened 10/21/2026

Virgin Islands Port Authority·U.S. Virgin Islands

67% match

STTJ)-2027-02 (Professional Janitorial Services at Marine Facilities in St. Thomas/St. John District

Closes 11/10/2026Opened 10/16/2026

U.S. Department Of Homeland Security·Washington

66% match

CGC-HENRY-BLAKE-DRYDOCK-REPAIRS

Closes 11/12/2026Opened 10/27/2026

U.S. Department Of Defense·United States of America

66% match

20--HATCH,MARINE, IN REPAIR/MODIFICATION OF

Closes 11/10/2026Opened 9/25/2026

Jacksonville Port Authority·Florida

66% match

TALLEYRAND MARINE TERMINAL (TMT) PILE, CAP, AND BEAM REHAB

Closes 11/3/2026Opened 10/1/2026

U.S. Department Of Defense·Washington

66% match

USCG Station at Cape Disappointment

Closes 11/15/2026Opened 10/23/2026

U.S. Department Of Defense·Minnesota

66% match

Duluth Vessel Yard Phase III Repairs

Closes 12/1/2026Opened 10/28/2026