The Navajo Nation Fiscal Recovery Fund Office is seeking a qualified contractor to pump and clean septic tanks at 476 residential homes and to design‑build new On‑Site Wastewater Treatment Systems (OWTS) at 12 homes within the Torreon Chapter. The work must be completed by December 31 2026, with proposals due April 24 2026. The contractor must provide all labor, equipment, disposal, permitting, and documentation, and must hold the necessary licenses, bonds, and insurance. Preference is given to Navajo‑certified firms, but any responsive bidder may compete.
• Pump and clean 476 existing septic tanks, including inspection, baffle servicing, and proper wastewater disposal.
• Design, permit, and install new OWTS for 12 residences, including soil analysis, engineering plans, excavation, tank installation, and final inspection.
• Submit detailed cost proposal (no fixed ceiling), performance/payment bonds, insurance, and all required certifications; three hard‑copy sealed copies required.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.