The State of California’s Department of Forestry and Fire Protection (CAL FIRE) is seeking qualified small‑business contractors to replace the existing water main serving the Valley View Fire Center. The work includes excavation, installation of approximately 1,983 linear feet of Schedule 80 steel pipe (3‑in. transitioning to 2‑in.), installation of two valves, hydrostatic and bacterial testing, backfill with imported aggregate, and asphalt restoration. The contractor must hold a valid C‑36 Plumbing Contractor or A‑General Engineering Contractor license, provide required insurance and bonds, and comply with all safety, testing, and reporting requirements. The contract period is estimated at one year, beginning June 1 2026, with a budgetary engineer’s estimate of $400 k.
• Install ~1,983 ft of Schedule 80 water pipe (3‑in. to 2‑in.) and two valves, ending at the facility connection point.
• Perform hydrostatic pressure testing (200 PSIG) and line disinfection/bacteria testing before service.
• Provide backfill using imported aggregate, restore asphalt surface, and handle all permitting, utility locating, and disposal requirements.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.