The U.S. Coast Guard is seeking sources for dockside repairs of the USCGC KUKUI (WLB 203), a 225-foot Seagoing Buoy Tender. The scope of work includes various tasks such as fire prevention requirements, tank cleaning and inspection, hydraulic system inspection and service, and more. The anticipated period of performance is from 31 March 2026 to 9 June 2026. The place of performance will be at the contractor's facility. Interested companies should reply to the Sources Sought Notice by 31 December 2025, providing information about their business size status, point of contact, and intention to submit a bid.
• Fire Prevention Requirements
• Tanks, Potable Water, Clean and Inspect
• Hydraulically Operated Cargo Hatch, Inspect and Service
• Vent Ducts, Galley and Pantry Room, All Commercial Cleaning
• Hydraulic Inhaul Winch, Inspect and Service
• Single Point Davit, Inspect and Service
• Sewage Holding Tanks, Clean and Inspect
• Tanks (Sewage Holding), Preserve and Inspect
• Temporary (Sewage Holding), Preserve, Partial
• Deck Covering, Interior, Wet and Dry, Renew
• Shower Renew
• Pilot House Window Replace
• Steering Ram Seals, Renew
• Pilot House Window Replace
• Steering Ram Seals, Renew
• Sewage Piping, Renew
• Firemain (FM) Piping, Renew
• Boat Deck, Port and Starboard, Removable Lifeline Latches, Modify
• Lifelines and Ancillary Fittings, Modify
• Steering Gear Heat Exchanger
• Tanks, Potable Water, Preserve, Partial
• Complete MMA Anchor Windlass Valve Mods WLB-225 A Class Cutters
• Independent NACE Inspector (Level 3), Provide
• Auxiliary Machinery Room, Upper-Level Deck, Preserve
• Tenting, Provide
• Mechanical Chain Stopers, Inspect and Service
• Directional Condition Valve, Upgrade
• Crossdeck Winches, Inspect and Service
• Buoy Crane, Appleton EB600-60-40, Inspect and Service
• Sewage Piping, Clean and Flush
• SORS Cargo Rail Remove
• Steering System PLC, Upgrade
• SSDG Isolation Mount, Renew
• Fluxgate Digital Compass System, Upgrade
• Circuit Breakers, Inspect, Maintain and Test
• Hydraulic Chain stoppers, Inspect and Service
• Hull Fittings (Weight Handling Rigging Hardware), Inspect and Test
• Grey Water Holding Tanks, Clean and Inspect
• Tanks, Grey Water Holding, Preserve, Partial