Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Vermont guideVermont Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More environmental services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Vermont
  4. ›Environmental Services
  5. ›Vermont Studio Center Floodplain Restoration Project…

Lamoille County Planning Commission·Vermont

Vermont Studio Center Floodplain Restoration Project - Final Design Engineering

Closes 6/3/2026$200k – $500kRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Vermont Studio Center is seeking a proposal for the final design engineering of the floodplain restoration project. The project aims to restore natural floodplain conditions and enhance the stream buffer along the banks of the Gihon River. The proposed 0.4-acre floodplain restoration project would take place adjacent to a pollinator garden and walking path with a gradual slope leading down to the Gihon River. The project would slow the velocity of the river and provide more flood storage capacity during future flooding events. • The project would entail removing existing fill and riprap as well as reducing the gradient of the current riverbank. • The project would provide more flood storage capacity during future flooding events. • The project would slow the velocity of the river. • The project would enhance the stream buffer along the banks of the Gihon River.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Megan Rodier(Regional Planner)

[email protected]

(802) 851-6339

Key dates

Opened
5/19/2026
Questions due
5/27/2026
Closes
6/3/2026

Last updated

Details

Type
Request for Proposal
Industry
Environmental Services
NAICS
541620
Solicitation №
73775

Budget estimate

$200,000 – $500,000

The budget for this project can be estimated based on the scope of work, which includes removing existing fill and riprap, reducing the gradient of the current riverbank, and enhancing the stream buffer. The cost of such a project can vary widely depending on the size of the area, the materials used, and the labor costs. However, a rough estimate for a project of this nature could be in the range of $200,000 to $500,000.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

County of Ontario·New York

Top match · 77%

Geneva Drinking Water Plant Floodplain Restoration Project Feasibility Study

Closes 12/15/2026Opened 10/15/2026

East Bay Municipal Utility District·California

75% match

Mokelumne River Floodplain Habitat Restoration Project

Closes 11/6/2026Opened 9/21/2026

Village of Johnson·Vermont

74% match

Johnson WWTP Engineer RFP

Closes 11/12/2026Opened 10/14/2026

Virginia Polytechnic Institute and State University·Virginia

72% match

VT Duck Pond Water Quality Improvements – Pond Edge Restoration

Closes 11/10/2026Opened 10/6/2026

Virginia Polytechnic Institute and State University·Virginia

72% match

VT Duck Pond Water Quality Improvements – Pond Edge Restoration

Closes 11/3/2026Opened 10/6/2026

NYS Ontario County·New York

72% match

Geneva Drinking Water Plant Floodplain Restoration Project Feasibility Study

Closes 12/15/2026Opened 10/16/2026

Department of Buildings & General Services·Vermont

72% match

Groton State Forest Beaver Depot Flood Repairs

Closes 11/5/2026Opened 10/7/2026

City University of New York·New York

71% match

College of Staten Island-Campus-Wide Flood Mitigation

Closes 12/18/2026Opened 9/25/2026

North Carolina County of Mecklenburg·North Carolina

71% match

Barlowe Road Flood Mitigation and Water Quality Improvement Project

Closes 11/19/2026Opened 10/26/2026

Manatee County - Purchasing Division·Florida

70% match

MUSGRAVE RANCH ROAD FLOODPLAIN COMPENSATION

Closes 11/20/2026Opened 10/15/2026

Connecticut Town of East Hartford·Connecticut

70% match

R.F.P. - Engineering Services for the Town's Levee System

Closes 11/17/2026Opened 10/1/2026

City of Farmers Branch·Texas

70% match

Waterline Replacement Engineering Design

Closes 11/3/2026Opened 10/1/2026

Laramie Rivers Conservation District·Wyoming

70% match

Laramie River - Hart Ranch Restoration

Closes 11/8/2026Opened 8/27/2026

Oregon Urban Flood Safety & Water District·Oregon

70% match

Water Resources Engineering On-Call Services

Closes 12/3/2026Opened 10/19/2026

City of Charlotte·North Carolina

70% match

Newell Stream Restoration Project

Rolling / TBD closeOpened 7/15/2026

City of Cedar Rapids·Iowa

69% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

Sterling Heights·Michigan

69% match

NORTH VAN DYKE AVENUE CORRIDOR IMPROVEMENTS & STORMWATER RESILIENCE PLANNING

Closes 11/10/2026Opened 9/30/2026

U.S. Department Of Defense·Texas

69% match

FY26 HARLINGEN PLACEMENT AREA (PA)13 AND 10 IMPROVEMENTS

Closes 9/10/2027Opened 9/10/2026

City of Charlotte·North Carolina

69% match

Valleybrook Storm Drainage Improvement Project

Rolling / TBD closeOpened 5/15/2027

City of Cedar Rapids·Iowa

69% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

Windham Regional Commission·Vermont

69% match

Windham Bank Stabilization #CA0901

Closes 11/30/2026Opened 10/26/2026

Washakie County Conservation District·Wyoming

69% match

Big Horn River Bank Stabilization Project

Closes 12/1/2026Opened 10/29/2026

City of Fitchburg·Wisconsin

69% match

Yarmouth Greenway Streambank Restoration

Closes 11/10/2026Opened 10/29/2026

Orange County, Florida·Florida

69% match

Bonnie Brook Subdivision Drainage Improvements Engineering Design Services

Closes 11/17/2026Opened 10/15/2026

City of Virginia Beach·Virginia

69% match

COVB-26-101639-2 - Central Resort District Drainage Improvement Phase 1 Design-Build

Closes 11/5/2026Opened 10/23/2026