Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Pricing your quoteWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More aerospace and defense bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›LHA-7 Sea Water Flushing Piping in Main Deck; replace

U.S. Department Of Defense·U.S. Armed Forces – Pacific

LHA-7 Sea Water Flushing Piping in Main Deck; replace

Closes 7/20/2026$100k – $500kRequest for Quotation
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The US Navy is soliciting quotes for the replacement of sea water flushing piping in the main deck of the USS TRIPOLI (LHA-7). The work will be performed at the Sasebo Naval Base in Japan. The contractor must possess an active Master Ship Repair Agreement (MSRA) or Agreement for Boat Repair (ABR) in the Japan Region. The period of performance is from 17 Aug 2026 to 30 Nov 2026. Key aspects of the job include: • Replacement of sea water flushing piping in the main deck • Performance of work at the Sasebo Naval Base in Japan • Requirement for an active MSRA or ABR in the Japan Region • Period of performance from 17 Aug 2026 to 30 Nov 2026

Attached files

Contact

Kei Akagi(Contract Specialist)

[email protected]

(315) 252-2886

Key dates

Opened
7/13/2026
Closes
7/20/2026
Duration
105 days

Last updated

Details

Type
Request for Quotation
Industry
Aerospace and Defense
NAICS
336611
Solicitation №
N6264926Q0456

Budget estimate

$100,000 – $500,000

Based on the information provided, the budget for this project is estimated to be around $100,000 to $500,000. This estimate is based on the scope of work, which involves the replacement of sea water flushing piping in the main deck of a naval vessel. The actual budget may vary depending on the complexity of the work, the materials required, and the labor costs.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Bellevue·Washington

Top match · 67%

2027 Phase 1 Water Main Replacement

Closes 11/12/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

67% match

Replace, Nonskid Deck Covering on FWD 04 Level Weather Deck etc

Closes 11/17/2026Opened 10/28/2026

U.S. Department Of The Interior·Colorado

67% match

LARO 258755 - Replace Dilapidated Docks and Fuel S

Closes 11/10/2026Opened 9/11/2026

U.S. Department Of Defense·United States of America

66% match

Support, Rev-01 (FO)~Well Deck Assessment

Closes 11/3/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

66% match

Replace, Chemical-resistant Flooring in Laundry

Closes 11/17/2026Opened 10/28/2026

Hawaii Department of Defense·Hawaii

66% match

Installation of new replacement backflow preventor assembly, to include all necessary plumbing parts

Closes 11/10/2026Opened 10/14/2026

City of DeLand·Florida

66% match

2026 PARTS A-C, & F WALTS AVE & NEW ST WATER MAIN IMPROVEMENTS

Closes 11/12/2026Opened 10/9/2026

City of Key West·Florida

66% match

A-Dock Replacement and D-Dock Decking Replacement Key West Bight Marina

Closes 11/23/2026Opened 10/15/2026

Eastern Municipal Water District·California

65% match

Lindenberger Road Pipeline Replacement

Closes 11/17/2026Opened 10/20/2026

U.S. Department Of Homeland Security·California

65% match

USCGC TERRELL HORNE – SEWAGE PIPING RENEWAL

Closes 11/11/2026Opened 10/28/2026

U.S. Department Of Homeland Security·Maryland

65% match

Dry-Dock: USCG ANT PUGET SOUND (55107) FY27 DD

Closes 11/5/2026Opened 9/25/2026

Hawaii Community Development Authority·Hawaii

65% match

Honuakaha Hot Water Return Systems Modifications

Closes 11/20/2026Opened 10/26/2026

Santa Maria-Bonita School District·California

65% match

BONITA SCHOOL DRINKING WATER IMPROVEMENTS

Closes 12/14/2026Opened 10/30/2026

State of Hawaii Department of Transportation – Harbors Division·Hawaii

65% match

P10904 Domestic & Fire Waterline Systems Replacement Pier 51A

Closes 12/3/2026Opened 10/8/2026

City of Ontario·California

65% match

UT 1065 FY2026-27 Water Main Improvements

Closes 11/18/2026Opened 10/14/2026

University of Massachusetts Lowell·Massachusetts

65% match

USuites Hot Water Replacement

Closes 11/4/2026Opened 10/21/2026

City of Holly Grove·Arkansas

65% match

Water System Improvements – Waterline Replacement

Closes 11/18/2026Opened 10/25/2026

Greater Cleveland Regional Transit Authority·Ohio

65% match

Dry Fire Piping System Replacement – Hayden District

Closes 11/23/2026Opened 10/19/2026

U.S. Department Of Energy·Illinois

65% match

PIP-II F-37 BUILDING LWC PUMP ROOM PIPING SYSTEM INSTALLATION

Closes 11/19/2026Opened 10/8/2026

U.S. Department Of Homeland Security·Washington

64% match

Dry-Dock: USCG ANT PUGET SOUND (55107) FY27 DD

Closes 11/5/2026Opened 9/25/2026

New York City Department of Design and Construction·New York

64% match

EMERGENCY WATER MAINS

Rolling / TBD closeOpened 3/12/2021

U.S. Department Of Veterans Affairs·Washington

64% match

Water system Maintenance

Closes 11/6/2026Opened 10/30/2026

East Bay Municipal Utility District·California

64% match

FMC733-26-02 Stott Reservoir Joint Sealant Removal and Replacement

Closes 11/24/2026Opened 10/27/2026

Oregon Tualatin Valley Water District·Oregon

64% match

TVWD ITB 2027-004 176th & Sugar Plum Water Main Replacement

Closes 11/19/2026Opened 10/28/2026

City of La Mesa·California

64% match

La Mesa Police Department Garage Deck Waterproofing

Closes 11/10/2026Opened 10/16/2026