This opportunity is for the reconstruction and upgrade of a 18.5‑mile segment of the Quartz Creek to Sterling 115 kV transmission line to a 230 kV standard. The contractor will replace existing wooden structures with steel H‑frames and self‑supporting poles, install a larger 795 kcmil ACSR conductor, and lay OPGW fiber optic cable. The scope includes all civil foundations, steel fabrication, installation, testing, as‑built documentation, and a two‑year workmanship warranty.
• Replace existing wood H‑frames and guyed structures with steel H‑frames (direct‑embed, pipe‑pile, or drilled concrete foundations).
• Install new 795 kcmil ACSR “Drake” conductor and OPGW in the shield‑wire position, terminating at structures 12‑7 and 31‑3.
• Provide all required documentation, drawings, and a 2‑year warranty; manage outage coordination, utility locates, and lien releases.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.