The City of Bryan, Texas, is seeking bids for the construction of the Brushy Creek Substation. The project includes site work, concrete, grounding, electrical raceway systems, control building, steel, yard equipment, cable and accessories, power, lighting, and control devices, and installation of major substation equipment. The contractor will be responsible for performing all site demolition work, soil amendments, site grading, compaction, gates, and final layer of white rock. The project requires a mandatory pre-bid meeting and site visit. The contractor must also provide all necessary permits and licenses required to complete the work.
Key aspects of the project include:
• Site work: demolition, grading, compaction, gates, and final layer of white rock
• Concrete: foundations, control building, and transformer containment pit
• Grounding: installation of all grounding and grounding materials
• Electrical: installation of power/control/communication cables, power circuit breakers, and control panels
• Steel: installation of steel structures, substation deadend "H" frame, and shield mast
• Yard equipment: installation of 138kV outdoor disconnect switches, insulators, potential transformers, and surge arresters
• Cable and accessories: installation of conductors, rigid bus fittings, and jumpers
The project has a completion date of January 28, 2028, and the contractor will be required to provide all necessary labor, materials, and equipment to complete the work.