This solicitation seeks a firm‑fixed‑price contractor to perform a comprehensive HVAC and Building Automation System (BAS) upgrade for NOAA’s Atlantic Oceanographic and Meteorological Laboratory in Miami, FL. The work includes supplying, installing, and commissioning a new 290‑ton chiller, associated chilled‑water and condenser‑water piping, replacing several fan‑coil units, upgrading the DOAS, installing new VAV electric reheats, integrating all equipment with the existing Johnson Controls Metasys BAS, and completing required testing, balancing, and commissioning in both cooling and heating seasons. The contractor must also provide extensive documentation, as‑built drawings, O&M manuals, warranty plans, and a four‑hour training for AOML staff, while complying with a full suite of federal, state, and local codes and safety regulations.
• Replace / upgrade major HVAC components (chiller, FCUs, DOAS, VAV reheats, sensors) and integrate with Metasys BAS.
• Perform full testing, balancing, and dual‑season commissioning; provide O&M manuals, warranty documentation, and 4‑hour staff training.
• Meet strict schedule (bid due 9/29/2026, site visit optional 9/24/2026) and adhere to safety, quality‑control, and reporting requirements outlined in the SOW.