Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Virginia guideVirginia Bids and Bidding Guide
  • Pricing your quoteWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Virginia
  4. ›Water and Wastewater
  5. ›ANNUAL FLOW METER CALIBRATION, INSTALLATION, REPAIR AND…

Arlington County Government·Virginia

ANNUAL FLOW METER CALIBRATION, INSTALLATION, REPAIR AND REPLACEMENT

Closes 10/26/2026$100k – $250kRequest for Quotation
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The County of Arlington is seeking a qualified contractor to perform annual calibration, installation, repair, and replacement of flow meters used in water supply and sewage treatment systems. This effort ensures accurate measurement for billing, regulatory compliance, and system efficiency. The work includes on‑site service visits, testing of existing meters, removal and replacement of faulty units, and documentation of all activities. • Calibrate existing flow meters to manufacturer specifications and certify accuracy. • Install new flow meters where required, ensuring proper integration with existing infrastructure. • Repair or replace defective meters, providing all necessary parts and labor. • Deliver comprehensive reports and maintenance records for each serviced meter.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Alin Brasov(Buyer)

Key dates

Opened
9/16/2026
Closes
10/26/2026
Duration
1 year

Last updated

Details

Type
Request for Quotation
Industry
Water Management and Sanitation
NAICS
811310
Solicitation №
QQ-128529

Budget estimate

$100,000 – $250,000

Based on typical municipal flow‑meter service contracts, the scope (annual calibration of dozens to hundreds of meters, installation of replacements, labor, travel, and reporting) likely falls in the six‑figure range. A small‑to‑mid‑size contractor could expect a total contract value between $100,000 and $250,000, depending on the number of meters serviced and any additional emergency repairs required.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Arlington County Government·Virginia

Top match · 85%

ANNUAL FLOW METER CALIBRATION, INSTALLATION, REPAIR AND REPLACEMENT

Closes 11/9/2026Opened 10/30/2026

NYS Rockland County·New York

74% match

Flow Meter Inspection, Calibration and Testing Services

Closes 11/16/2026Opened 10/23/2026

City of Charlotte·North Carolina

74% match

Service Water Improvements and Flow Meter Modifications

Rolling / TBD closeOpened 1/31/2026

Michigan

74% match

938-17-16 - Verification, Preventative Maintenance, and Repair Services - Flow Meters

Closes 11/2/2026Opened 10/12/2026

City of Phoenix·Arizona

73% match

Flow Meters and Level Meters Supplemental

Closes 11/5/2026Opened 10/15/2026

The Metropolitan District·Connecticut

72% match

FLOW METER AND RAIN GAUGE REPLACEMENT

Closes 11/5/2026Opened 10/5/2026

Connecticut Metropolitan District Commission·Connecticut

71% match

FLOW METER AND RAIN GAUGE REPLACEMENT

Closes 11/5/2026Opened 10/6/2026

Atlantic County Utilities Authority, NJ·New Jersey

70% match

Atlantic City Flow Meter Replacement Project

Closes 11/4/2026Opened 10/6/2026

City of Bedford, TX·Texas

69% match

Water Meter Installations

Closes 11/12/2026Opened 10/9/2026

The Ohio State University·Ohio

69% match

OSU-255480 JOC HHW and CHW Meter Replacement

Closes 11/12/2026Opened 10/8/2026

Mississippi MS Department of Public Safety·Mississippi

69% match

Annual Equipment Certification Calibration of Instruments in all branches of the Mississippi Forensic Laboratory

Closes 11/10/2026Opened 10/9/2026

City of Boca Raton·Florida

68% match

Installation and/or Replacement of Potable and, or Reclaimed Water Meters with AMI Transponders

Closes 11/23/2026Opened 10/20/2026

City of Punta Gorda·Florida

68% match

SVC-AMI/1626 - Advanced Metering Infrastructure (AMI)

Closes 11/20/2026Opened 9/25/2026

City of Boca Raton·Florida

68% match

Installation and/or Replacement of Potable and, or Reclaimed Water Meters with AMI Transponders

Closes 11/23/2026Opened 10/20/2026

Massachusetts Town of Kingston·Massachusetts

68% match

Water Meter and Advanced Metering Analytics Maintenance

Closes 11/4/2026Opened 10/15/2026

Hilton Head Public Service District·South Carolina

67% match

Hilton Head Public Service District Meter Replacement RFQ

Closes 11/10/2026Opened 10/8/2026

U.S. Department Of Defense·United States of America

67% match

FLUXMETER

Closes 11/5/2026Opened 10/6/2026

City of Pasadena·California

67% match

Advanced Metering Infrastructure (AMI) System and Installation Services

Closes 12/1/2026Opened 10/13/2026

City of Holly Grove·Arkansas

67% match

City of Holly Grove Water System Improvements – Water Meter Replacement

Closes 11/18/2026Opened 10/25/2026

Georgia City of Oxford·Georgia

66% match

City of Oxford Water and Electric Meter Replacement

Closes 11/4/2026Opened 9/29/2026

The Metropolitan Water District of Southern California·California

66% match

Furnish one hundred sixty (160) Chemical Flow Meters for the Metropolitan Water District Skinner Plant

Closes 12/7/2026Opened 10/26/2026

U.S. Department Of Defense·Oklahoma

66% match

48--VALVE,CALIBRATED FLOW

Closes 11/1/2026Opened 10/22/2026

City of Aumsville·Oregon

66% match

Automatic Metering Infrastructure Supply & Installation

Closes 11/17/2026Opened 10/20/2026

University of South Carolina·South Carolina

66% match

Flow Meter by YSI, INC

Closes 12/12/2026Opened 12/8/2025

California Department of Industrial Relations·California

66% match

IFB S26DOSH006 Gas Detection and Air Sampling Equipment Calibration and Repair Services

Closes 11/5/2026Opened 10/16/2026