The State of Michigan is seeking bids for the replacement of the existing walk-in cooler freezer combination unit with a new walk-in cooler and separate walk-in freezer at the Alger Correctional Facility. The project includes providing new LED lighting in the units, removing and replacing the existing cooler and freezer remote refrigeration with new components, and providing a new roof over the refrigeration components. The contractor must figure their base bid on the specified materials and equipment only, with no substitutions or "or equal" proposals allowed after bid opening. A mandatory pre-bid conference and site tour will be held on April 8, 2026.
• The project requires the removal and replacement of the existing walk-in cooler freezer combination unit.
• The contractor must provide new LED lighting in the units.
• The existing cooler and freezer remote refrigeration must be removed and replaced with new components.
• A new roof must be provided over the refrigeration components.
• The contractor must comply with all applicable laws, regulations, and standards, including those related to environmental regulations and fire safety.
• The contractor must ensure that all materials and equipment meet the specified requirements and are installed in accordance with the manufacturer's instructions and industry standards.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.