The City of Forest Grove is seeking bids for the College Way Water Main Improvements project. The work includes providing all construction services, equipment, necessary tools, materials, fuel, personnel, supervision, and labor required to complete the preparation and placement of 1,300 feet of 8-inch CL. 52 D.I. fully restrained water line, fittings, valves, water service pipe, and new meter boxes. The project also involves HMAC trench resurfacing, minor removal and replacement of concrete curb and gutter, sidewalks, driveways, and ADA access ramps. The estimated cost range for the project is $410,000 to $450,000. The city intends to issue a notice to proceed on May 18, 2026, and have the work completed by July 31, 2026.
Some key aspects of the project include:
• Providing all necessary construction services and materials
• Installing 1,300 feet of 8-inch water main
• Performing HMAC trench resurfacing
• Removing and replacing concrete curb and gutter, sidewalks, and driveways
• Restoring and performing additional work as specified in the plans and specifications
• Completing the work within the specified timeline and budget