Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Oregon guideOregon Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Oregon
  4. ›Construction
  5. ›RFQ#2026-28 Kellogg Creek Influent Pump Station Headworks…

Oregon Clackamas County·Oregon

RFQ#2026-28 Kellogg Creek Influent Pump Station Headworks Pipe Replacement

Closes 5/20/2026$120k – $180kRequest for Quotation
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The project involves the removal and replacement of four existing 24-inch discharge pipes at the Kellogg Creek Influent Pump Station, located at the Kellogg Creek Water Resource Recovery Facility in Milwaukie, Oregon. The work includes demolition and removal, pipe replacement, concrete wall restoration, flap gate refurbishment, testing, and site restoration. The project requires a minimum of two discharge pipes to remain in service at all times during construction, and the contractor is responsible for maintaining the required minimum flow capacity throughout construction. • The existing discharge pipes are approximately 10 feet in length and run horizontally between two concrete walls. • The pipes are currently exposed and accessible via hatches above the pipe corridor. • The project requires the contractor to core, cut, or otherwise remove the concrete as necessary to extract the existing embedded pipe sleeves and wall penetrations. • The base quote pipe material shall be lined ductile iron with a shop-applied exterior corrosion protection system. • Quoters are encouraged to also provide alternative pricing for 316L stainless steel and/or coated carbon steel. • The project estimate is $150,000.00, and the work must be substantially completed no later than September 30, 2026.

Attached files

Contact

Tralee Whitley(Procurement Analyst)

[email protected]

(503) 742-5453

Key dates

Opened
4/20/2026
Closes
5/20/2026
Duration
134 days

Last updated

Details

Type
Request for Quotation
Industry
Construction
NAICS
237110
Solicitation №
S-C01010-00016669

Budget estimate

$120,000 – $180,000

The budget for this project is estimated to be around $150,000.00, as specified in the project estimate. This amount may vary depending on the quotes received and the final contract award. The budget may be influenced by factors such as the cost of materials, labor, and equipment, as well as the complexity of the project and the contractor's experience and reputation.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Massachusetts City of Haverhill·Massachusetts

Top match · 73%

South Mill Street Pump Station Header Piping Replacement

Closes 11/5/2026Opened 10/21/2026

City of Rockford·Illinois

72% match

LEAD SERVICE LINE REPLACEMENT PHASE 11H

Closes 11/2/2026Opened 9/14/2026

City of Tampa, Florida·Florida

72% match

RFQ 27-D-00003 43rd St. Pump Station Force Main Replacement Design

Closes 12/3/2026Opened 10/30/2026

City of Redlands·California

71% match

2026 CIP Water Pipeline Replacement Project

Closes 11/16/2026Opened 10/29/2026

City of Rockford·Illinois

71% match

LEAD SERVICE LINE REPLACEMENT PHASE 11G

Closes 11/2/2026Opened 9/14/2026

Tarrant Regional Water District·Texas

71% match

Cedar Creek Section 2 Phase 2 Pipeline Replacement

Closes 12/10/2026Opened 10/29/2026

City of Grand Forks·North Dakota

70% match

2027 Lead Service Line Replacement

Closes 11/19/2026Opened 10/29/2026

City of Beaumont·California

70% match

IFB 26-21 ONGOING PIPELINE REPLACEMENT (CIP WW26-12)

Closes 12/1/2026Opened 10/22/2026

City of Shawnee·Kansas

70% match

2027 Annual Stormwater Pipe Repair Project

Closes 11/12/2026Opened 10/22/2026

City of Rockford·Illinois

70% match

LEAD SERVICE LINE REPLACEMENT PHASE 11I

Closes 11/2/2026Opened 9/14/2026

Upper Occoquan Service Authority·Virginia

70% match

UOSA IFB 27-02 P2NR+ Construction

Closes 11/4/2026Opened 8/24/2026

Goodwyn Mills Cawood·Georgia

70% match

Mechanicsville & Jones Mill Road Water Main Replacement

Closes 11/12/2026Opened 10/1/2026

Cape Fear Public Utility Authority·North Carolina

70% match

RFQ - Condition Evaluation for Replacement of Pump Station #33 Shamrock

Closes 11/5/2026Opened 10/7/2026

Oregon Tualatin Valley Water District·Oregon

69% match

TVWD ITB 2027-004 176th & Sugar Plum Water Main Replacement

Closes 11/19/2026Opened 10/28/2026

City of Charlotte·North Carolina

69% match

McDowell WWTP Headworks Improvements

Rolling / TBD closeOpened 6/1/2026

Oregon Parks and Recreation Department·Oregon

69% match

14546 Jessie M. Honeyman SP Water Intake Replacement (Construction)

Closes 11/2/2026Opened 10/7/2026

North Carolina Cape Fear Public Utility Authority·North Carolina

69% match

RFQ - Condition Evaluation for Replacement of Pump Station #33 Shamrock

Closes 11/5/2026Opened 10/8/2026

Hilton Head Public Service District·South Carolina

69% match

Hilton Head Public Service District Meter Replacement RFQ

Closes 11/10/2026Opened 10/8/2026

City of Billings·Montana

69% match

W.O. 26-08: WRF Digester Gas Pipe Replacement

Closes 11/4/2026Opened 10/1/2026

St. John the Baptist Parish Government·Louisiana

69% match

RFQ 2026.30 Engineering Services for Vicknair Canal Pump Station

Closes 11/19/2026Opened 10/28/2026

Gwinnett County Government·Georgia

69% match

Beaver Ruin Diversion Pump Station Grinders Replacements Project

Closes 11/20/2026Opened 10/7/2026

City of Charlotte·North Carolina

69% match

McDowell Creek Wastewater Treatment Plant Clarifier & Pumping Station

Rolling / TBD closeOpened 1/1/2027

City of Billings·Montana

69% match

W.O. 26-08: WRF Digester Gas Pipe Replacement

Closes 11/4/2026Opened 10/2/2026

City of Branson·Missouri

69% match

RFB 2900-16 Annual Lift Station Pump Rebuilds Replacements 2027

Closes 11/20/2026Opened 10/20/2026