Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Ohio guideOhio Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Ohio
  4. ›Construction
  5. ›Former Water Treatment Plant – Utility Abandonment

City of Marysville, Ohio·Ohio

Former Water Treatment Plant – Utility Abandonment

Closes 9/11/2026$300k – $800kInvitation for BidLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Marysville is seeking a qualified contractor to remove and abandon existing underground water‑utility infrastructure at the former Water Treatment Plant located at 409 N Main St. The work includes partial abandonment of utilities using Flowable Controlled‑Density Fill (FCDF), full removal of other utilities, minor grading to ensure drainage, and removal of two on‑site clearwells with back‑fill. The contract is a lump‑sum bid with unit‑price items for pipe removal, FCDF fill, grading, and clearwell demolition, and must comply with Ohio prevailing‑wage statutes, bonding, and insurance requirements. Bids are submitted electronically via BidExpress, and a 100 % bid bond (or 10 % cash/letter‑of‑credit) is required. The project must be completed within 45 days after the notice to commence. • Utility abandonment: ~2,255 ft of pipes to be abandoned with FCDF. • Utility removal: ~3,455 ft of pipes to be fully removed. • Clearwell demolition: two clearwells removed to 1 ft below grade (alternate option for Clearwell #1 to 6 ft) and back‑filled with FCDF or structural fill. • Minor site grading and erosion control included. • All work subject to prevailing‑wage, bonding, insurance, and brownfield/historic‑site acknowledgments.

Attached files

Contact

Kimberly Sharp(City Manager)

Key dates

Opened
8/10/2026
Questions due
9/3/2026
Pre-bid meeting
8/18/2026
Closes
9/11/2026
Duration
45 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237130
Solicitation №
Solicitation No. 48577

Budget estimate

$300,000 – $800,000

Based on the unit‑price items disclosed (e.g., $10,000 for erosion control, estimated linear‑foot quantities for pipe removal, and the substantial volume of FCDF fill), plus typical overhead and profit margins for a 45‑day civil‑construction job, the total contract value is likely in the mid‑hundreds of thousands. Assuming an average unit price of $30‑$50 per linear foot for pipe removal and $80‑$120 per cubic yard for FCDF, the total could range from roughly $300,000 to $800,000. The estimate accounts for material costs, labor under prevailing‑wage rates, bonding, insurance, and a modest profit margin.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Town of Dumfries·Virginia

Top match · 70%

IFB # 27-003 - UTILITY ABANDONMENT AND SITE RESTORATION AT 3800 GRAHAM PARK ROAD

Closes 11/5/2026Opened 10/15/2026

Dickenson County·Virginia

70% match

Dickenson County Public Service Authority Haysi Wastewater Treatment Plant

Closes 11/16/2026Opened 9/30/2026

U.S. Department Of Defense·United States of America

70% match

Waste Water Treatment Plant Services

Closes 11/23/2026Opened 10/12/2026

City of Hollywood·Florida

69% match

Water Treatment Plant Maintenance Package 'B'; Project No. 25-4262

Closes 12/3/2026Opened 10/26/2026

City of Grand Pass·Oregon

68% match

Water Treatment Plant Solids Hauling FY24-26

Closes 12/31/2026Opened 3/1/2023

City of Long Prairie·Minnesota

68% match

Long Prairie, City of Water Treatment Plant Rehabilitation 25X.138024

Closes 11/18/2026Opened 10/29/2026

Town of Narragansett·Rhode Island

68% match

Stand-by Generator Replacement - WWTP

Closes 11/6/2026Opened 11/6/2026

South Carolina Rural Water Association (SCEMD Grant)·South Carolina

67% match

Notice Of Intent To Sole Source By South Carolina Rural Water Association for Two WaterStep Water On Wheels (WOW) Cart Mobile Water Treatment Units

Rolling / TBD closeOpened 9/9/2026

Dept of Natural Resources·Wisconsin

67% match

Private Drinking Water Treatment System Consulting, Equipment and Installation Services – Marinette

Closes 11/13/2026Opened 10/26/2026

Commonwealth of Kentucky·Kentucky

67% match

Water and Wastewater Operations, Maintenance, Monitoring

Closes 11/16/2026Opened 10/28/2026

U.S. Department Of Defense·Hawaii

67% match

Utilities Privatization of the Water System at U.S. Army Garrison-Hawaii (USAG-HI), Island of Oahu

Closes 1/7/2027Opened 9/25/2026

City of Salisbury·Maryland

67% match

Park Water Treatment Plant PFAS Study 1

Closes 11/27/2026Opened 10/29/2026

Stafford County·Virginia

67% match

Aquia Plant Aluminum Sulfate Tank Replacement

Closes 11/4/2026Opened 10/9/2026

Town of Lexington·South Carolina

67% match

SERVICES FOR POTABLE WATER SYSTEM HYDRAULIC MODELING AND PROGRAM MANAGEMENT

Closes 11/5/2026Opened 9/16/2026

Winnebago County·Wisconsin

66% match

HORIZONTAL GROUNDWATER EXTRACTION SYSTEM ABANDONMENT

Closes 12/2/2026Opened 10/6/2026

Eastern Municipal Water District·California

66% match

Purified Water Replenishment SJV Advanced Water Purification Facility

Closes 11/19/2026Opened 8/25/2026

U.S. Department Of Defense·Virginia

66% match

Utilities Privatization of the Water System at U.S. Army Garrison-Hawaii (USAG-HI), Island of Oahu

Closes 1/7/2027Opened 5/29/2026

City of Charlotte·North Carolina

66% match

McDowell Creek Wastewater Treatment Plant Clarifier & Pumping Station

Rolling / TBD closeOpened 1/1/2027

Gainesville Regional Utilities·Florida

66% match

Acquisition, Ownership, Operation, Maintenance and Transfer of Cross Creek Water and Wastewater Systems

Closes 11/3/2026Opened 9/3/2026

Upper Occoquan Service Authority·Virginia

66% match

UOSA IFB 27-02 P2NR+ Construction

Closes 11/4/2026Opened 8/24/2026

City of Hollywood·Florida

66% match

Water Treatment Plant Maintenance Package ‘A’; Project No. 25-4261

Closes 11/25/2026Opened 10/20/2026

City of Neptune Beach·Florida

66% match

Water Treatment Plant Ground Storage Reservoir Rehabilitation

Closes 11/9/2026Opened 10/2/2026

U.S. Department Of Defense·United States of America

66% match

Sources Sought: Alternative Sources of Water for Small Units. (ACC-DTA CSO Amend 42)

Closes 11/6/2026Opened 10/30/2026

City of Ontario·California

66% match

Pure Water Ontario Advanced Water Purification Facility (UT1091)

Closes 11/13/2026Opened 10/15/2026

Texas Tx Dept Crim. Justice/inst Div·Texas

66% match

TDCJ - Water Treatment Plant for Memorial

Closes 11/23/2026Opened 10/7/2026