Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›Water Well Project, U.S. Embassy Addis Ababa, Ethiopia

U.S. Department Of State·District of Columbia

Water Well Project, U.S. Embassy Addis Ababa, Ethiopia

Closes 12/15/2025$1M – $5MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The U.S. Consulate General Frankfurt is seeking a contractor to drill and construct a production well at the U.S. Embassy in Addis Ababa, Ethiopia. The project involves drilling and testing of one production well, which will provide a reliable water supply to the Embassy. The scope of work includes drilling, construction, well development and testing, water quality analysis, and completion and reporting. The successful offeror will be required to provide drilling, coordination, and construction management services. • The well will be drilled to a depth of approximately 550 meters ± 20%. • The scope of work includes borehole drilling, installation of steel casings and screens, gravel packing and cement grouting, well development and testing, and water quality analysis. • The successful offeror must comply with the requirements included in the solicitation, including being legally authorized to operate in Ethiopia and providing Irrevocable Letters of Credit (ILCs) or bonds totaling 40% of the value of the contract.

Attached files

Contact

Kenneth G. Mamba(Contract Specialist)

[email protected]

Key dates

Opened
11/28/2025
Closes
12/15/2025

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
237110
Solicitation №
19GE5025R0131

Budget estimate

$1,000,000 – $5,000,000

The estimated magnitude for the entire project is between $1,000,000.00 and $5,000,000.00 U.S. dollars. This range is relatively wide, but it gives an indication of the project's magnitude. The actual budget may vary depending on the complexity of the project, the materials and equipment required, and the labor costs. The budget may be influenced by factors such as the depth of the well, the type of drilling and construction required, and the need for specialized equipment and expertise. Based on the estimated magnitude, the budget could be around $3,000,000.00, but this is a rough estimate and the actual budget may be higher or lower.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of State·United States of America

Top match · 73%

Trenching, Conduit and Ground-well Installation

Closes 11/25/2026Opened 10/28/2026

City of Dunedin·Florida

72% match

Water Production Well Facilities Project

Closes 11/18/2026Opened 10/12/2026

Texas Brazos River Authority·Texas

71% match

RFP EWCRWS Infrastructure and Expansion - Trinity Well and Phase 1D Project

Closes 11/10/2026Opened 8/3/2026

Connecticut City of Meriden·Connecticut

71% match

Mule Well Rehabilitation

Closes 11/20/2026Opened 10/29/2026

Montana Department of Natural Resources and Conservation·Montana

70% match

2026 Summit DMA Orphan Well P&A

Closes 11/24/2026Opened 10/30/2026

U.S. Bureau of Reclamation·United States of America

70% match

WaterSMART Drought Response Program

Closes 10/2/2031Opened 3/5/2026

City of Meriden·Connecticut

70% match

RFP027-33 Mule Well Rehabilitation

Closes 11/20/2026Opened 10/29/2026

Southeast Arkansas Regional Intermodal Facility Authority·Arkansas

69% match

Request for Qualifications – Professional Engineering Services for SEARIFA Water Well Project

Rolling / TBD closeOpened 10/4/2026

U.S. Department Of Veterans Affairs·Washington

69% match

Water system Maintenance

Closes 11/6/2026Opened 10/30/2026

City of Meriden·Connecticut

69% match

RFP027-35 Evansville East Well Rehabilitation

Closes 11/20/2026Opened 10/30/2026

U.S. Bureau of Reclamation·United States of America

69% match

WaterSMART: Desalination Construction Projects

Closes 8/26/2027Opened 5/14/2026

City of Troy, OH·Ohio

69% match

Miami Shores Golf Course Pump Control Panel and Well Project

Closes 11/4/2026Opened 10/14/2026

U.S. Bureau of Near Eastern Affairs·United States of America

69% match

Egypt Annual Program Statement

Rolling / TBD closeOpened 9/2/2026

U.S. Bureau of African Affairs·United States of America

69% match

U.S.-Africa Strategic Investment Program

Closes 5/27/2027Opened 7/23/2026

U.S. Department Of Defense·Mississippi

69% match

Arkabutla Lake Water Plant Rehab and Pre-fabricated Metal Building Installation

Closes 11/6/2026Opened 10/21/2026

Washington Suburban Sanitary Commission, MD·Maryland

69% match

Potomac WFP Water Quality/PFAS Pilot Project

Closes 12/1/2026Opened 10/14/2026

U.S. Department Of Defense·Missouri

69% match

LOCK AND DAM 25 NEW 1,200 FT LOCK NAVIGATION AND ECOSYSTEM SUSTAINABILITY PROGRAM (NESP)

Closes 11/16/2026Opened 3/31/2026

City of Stillwater·Oklahoma

69% match

Lake McMurtry Pump Station

Closes 11/11/2026Opened 8/31/2026

Georgia City of Cartersville·Georgia

69% match

Project: Mechanicsville & Jones Mill Road Water Main Replacement

Closes 11/12/2026Opened 10/1/2026

U.S. Department Of Defense·Hawaii

69% match

Elevated Water Storage Tanks, Kolekole and East Range, Schofield Barracks, Oahu, Hawaii

Closes 9/8/2027Opened 9/8/2026

Washington Suburban Sanitary Commission, MD·Maryland

69% match

Water Engineering Services (BOA)

Closes 11/18/2026Opened 10/14/2026

U.S. Bureau of African Affairs·United States of America

69% match

U.S.-Africa Strategic Investment Program

Closes 5/31/2027Opened 8/19/2026

Massachusetts Town of Ayer·Massachusetts

69% match

Well Cleaning and Redevelopment

Closes 11/13/2026Opened 10/14/2026

U.S. Department Of Energy·Nevada

69% match

EXPRESSION OF INTEREST (EOI) / REQUEST FOR INFORMATION (RFI) 24” OD Drilling to 6,500’ TVD (RV/DC)

Closes 11/12/2026Opened 10/12/2026

Town of Eatonville·Florida

69% match

Drinking Water – Phase 1

Closes 11/9/2026Opened 10/6/2026