Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Alaska guideAlaska Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Alaska
  4. ›Construction
  5. ›E2290300 Quartz Creek to Sterling T-Line Rebuild Phase 2

Chugach Electric Association·Alaska

E2290300 Quartz Creek to Sterling T-Line Rebuild Phase 2

Closes 7/2/2026$30M – $55MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The project involves upgrading an existing 115 kV transmission corridor near Sterling, Alaska, to 230 kV standards. Work includes installing new steel H‑frame and pole‑angle structures, replacing conductors with 795 kcmil ACSR “Drake”, and adding OPGW fiber‑optic cable alongside an overhead ground wire. The contractor must deliver detailed construction schedules, provide required bonds and insurance, and coordinate outages and site locates with Chugach. • Re‑build 18.5 mi of transmission line to 230 kV, using steel H‑frames and steel‑pole angles with direct‑embed or pipe‑pile foundations. • Replace existing wood‑H‑frame/wood‑pole structures and 556.5 kcmil ACSR “Dove” conductors with 795 kcmil ACSR “Drake” conductors. • Install OPGW fiber‑optic cable in shield‑wire position on one side of each structure, and a 7/16‑in. EHS OHGW on the opposite side. • Provide as‑built drawings, warranties, and meet all safety, insurance, and bonding requirements; begin work within 30 days of NTP and complete by June 30 2027.

Attached files

Contact

Chris Kohler(Project Manager)

[email protected]

Key dates

Opened
5/5/2026
Questions due
6/11/2026
Pre-bid meeting
6/4/2026
Site visit
6/4/2026
Closes
7/2/2026
Duration
12 months

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
238210
Solicitation №
E2290300

Budget estimate

$30,000,000 – $55,000,000

No contract value is disclosed, but typical costs for 230 kV transmission line construction in remote terrain range from $1.5 M to $3 M per mile, plus additional $2‑5 M for OPGW and specialized foundations. For the 18.5 mi segment, total contract value is plausibly $30 M–$55 M. This estimate assumes standard material costs, mobilization for Alaska’s climate, and an experienced contractor’s markup.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Tarrant Regional Water District·Texas

Top match · 67%

Cedar Creek Section 2 Phase 2 Pipeline Replacement

Closes 12/10/2026Opened 10/29/2026

U.S. Department Of Defense·Missouri

65% match

Belle Fountain Ditch Cleanout Phase 2

Closes 11/3/2026Opened 10/13/2026

Massachusetts Town of Westborough·Massachusetts

65% match

27-2100 IFB Route 9 Water Main Rehabilitation-Phase I

Closes 11/19/2026Opened 10/28/2026

City of Rockford·Illinois

65% match

LEAD SERVICE LINE REPLACEMENT PHASE 11I

Closes 11/2/2026Opened 9/14/2026

Gloucester County·Virginia

64% match

IFB 27-012-CJ Clements Avenue Water Line Replacement

Closes 11/16/2026Opened 10/9/2026

Catawba Regional Council of Governments·South Carolina

64% match

Shannon Street Waterline Project

Closes 11/5/2026Opened 9/30/2026

U.S. Department Of Transportation·Wyoming

64% match

WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3

Closes 9/23/2028Opened 10/20/2026

City of Rockford·Illinois

64% match

LEAD SERVICE LINE REPLACEMENT PHASE 11H

Closes 11/2/2026Opened 9/14/2026

City of Rockford·Illinois

64% match

LEAD SERVICE LINE REPLACEMENT PHASE 11G

Closes 11/2/2026Opened 9/14/2026

Public Water Supply District No. 2 of St. Charles County·Missouri

64% match

Western Transmission Main Phase 4C

Closes 11/19/2026Opened 10/9/2026

City of Lake City and City of Bellechester·Minnesota

64% match

Lake City & Bellechester Lead Service Line Replacement Project

Closes 12/8/2026Opened 10/16/2026

Upper Occoquan Service Authority·Virginia

64% match

UOSA IFB 27-02 P2NR+ Construction

Closes 11/4/2026Opened 8/24/2026

City of Bellevue·Washington

64% match

2027 Phase 1 Water Main Replacement

Closes 11/12/2026Opened 10/22/2026

City of Waco·Texas

63% match

Flat Creek Reuse Project Phase 1A

Closes 12/1/2026Opened 10/2/2026

City of Grand Forks, North Dakota·North Dakota

63% match

2027 Lead Service Line Replacement

Closes 11/19/2026Opened 10/29/2026

Bristol Virginia Utilities Authority·Virginia

63% match

CAST IRON WATER LINE REPLACEMENT PROJECT - PHASE 1

Closes 11/5/2026Opened 10/1/2026

Riverton City·Utah

63% match

CC26-475 Main Water Tank Drainline Upgrade Project

Closes 11/17/2026Opened 10/30/2026

City of Lebanon·Indiana

63% match

Sanitary Ditch CSX Crossing - RE-BID

Closes 11/9/2026Opened 10/16/2026

Tuolumne County·California

63% match

Mechanical Site Prep: Jawbone Creek Item 2

Closes 11/13/2026Opened 10/16/2026

Town of Upton·Wyoming

63% match

Phase 2.2 - Wyoming & Montana Avenues, Improvements

Closes 11/6/2026Opened 10/23/2026

Maryland Department Of General Services·Maryland

63% match

F-001-260-004 Sand and Spring Run Subsidence Repair

Closes 11/5/2026Opened 9/23/2026

Georgia City of Elberton·Georgia

63% match

Electric Capital Improvement Project South Oliver Line Rehabilitation Project

Closes 12/2/2026Opened 10/23/2026

City of Charlotte·North Carolina

63% match

Newell Stream Restoration Project

Rolling / TBD closeOpened 7/15/2026

Oak Manor Municipal Utility District·Texas

63% match

Waterline Rehabilitation along Oak Trail, Oak Manor Drive, & Shady Oak Court

Closes 11/5/2026Opened 10/23/2026

County of Frederick, MD·Maryland

63% match

Water Distribution Improvements Phase II

Closes 11/10/2026Opened 9/9/2026