The Village of Gurnee is renovating its municipal fleet‑garage to accommodate a wider overhead door, remove an existing mezzanine stair, replace trench‑drain piping, and update structural, mechanical, electrical, plumbing, fire‑protection, and finish systems. The project must remain operational during construction, requiring phased work, coordination of multiple trades, and compliance with prevailing‑wage and Illinois public‑works statutes. Bids are sealed and due March 24, 2026.
• Demolition of existing overhead door, mezzanine stair, and related structural elements.
• Installation of a new 14‑ft wide, motor‑operated sectional overhead door with fire‑rated hardware.
• Structural steel, CMU wall, and concrete modifications, plus trench‑drain and underground piping replacement.
• Full MEP upgrades, fire‑extinguisher cabinet placement, ADA‑compliant doors, and high‑performance coating applications.
• Project schedule targets substantial completion by June 30 2026 and final completion by July 6 2026, with a $10,000 owner‑contingency allowance.